• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

3314.9.3 Plumb

NYC Building Code 2014 > 33 Safeguards During Construction or Demolition > 3314 Scaffolds > 3314.9 Supported Scaffold > 3314.9.3 Plumb
JUMP TO FULL CODE CHAPTER
Supported scaffold poles, legs, posts, frames, and uprights shall be plumb and braced to prevent swaying and displacement. The tolerance shall not exceed L/100, where L is the distance measured from the ground or grade elevation to the first X-brace or bottom of the first bearer or frame horizontal member.

Related Code Sections


101.4.4 Administration, Plumbing
The provisions of the New York City Plumbing Code shall apply to the installation, alteration, repair and replacement of plumbing systems ...
NYC Building Code 2008 > 1 Administration > 101 General > 101.4 Referenced Codes > 101.4.4 Plumbing
101.4.4 Administration, Plumbing
The provisions of the New York City Plumbing Code shall apply to the installation, alteration, repair and replacement of plumbing systems ...
NYC Building Code 2014 > 1 Administration > 101 General > 101.4 Referenced Codes > 101.4.4 Plumbing
3305.4.1 Safeguards During Construction or Demolition, Plumb
All framework shall be carried up true and plumb ...
NYC Building Code 2014 > 33 Safeguards During Construction or Demolition > 3305 Material Placement and Installation > 3305.4 Aluminum Erection > 3305.4.1 Plumb
3314.9.3 Safeguards During Construction or Demolition, Plumb
Supported scaffold poles, legs, posts, frames, and uprights shall be plumb and braced to prevent swaying and displacement. The tolerance shall ...
NYC Building Code 2008 > 33 Safeguards During Construction or Demolition > 3314 Scaffolds > 3314.9 Supported Scaffold > 3314.9.3 Plumb
3314.9.3 Safeguards During Construction or Demolition, Plumb
Supported scaffold poles, legs, posts, frames, and uprights shall be plumb and braced to prevent swaying and displacement. The tolerance shall ...
NYC Building Code 2014 > 33 Safeguards During Construction or Demolition > 3314 Scaffolds > 3314.9 Supported Scaffold > 3314.9.3 Plumb
Help Contact Us Privacy Terms
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code Compare
Code Compare
Highlight differences between any two building codes.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE