1305.3.7 Piping From Transfer Pump to Equipment or Storage Tanks Above the Lowest Floor
JUMP TO FULL CODE CHAPTER
Supply piping from a transfer pump to equipment at levels above the lowest floor or storage tanks at levels above the lowest floor in buildings shall also comply with the requirements of Section 1305.9.
Related Code Sections
1305.3.7 Fuel-Oil Piping and Storage, Piping From Transfer Pump to Equipment or Storage Tanks Above the Lowest Floor
Supply piping from a transfer pump to equipment at levels above the lowest floor or storage tanks at levels above the lowest floor in buildings shall ...
NYC Mechanical Code 2014 > 13 Fuel-Oil Piping and Storage > 1305 Fuel-Oil System Installation > 1305.3 Supply Piping > 1305.3.7 Piping From Transfer Pump to Equipment or Storage Tanks Above the Lowest Floor
1305.3.7 Fuel-Oil Piping and Storage, Piping From Transfer Pump to Equipment or Storage Tanks Above the Lowest Floor
Supply piping from a transfer pump to equipment at levels above the lowest floor or storage tanks at levels above the lowest floor in buildings shall ...
NYC Mechanical Code 2008 > 13 Fuel-Oil Piping and Storage > 1305 Fuel-Oil System Installation > 1305.3 Supply Piping > 1305.3.7 Piping From Transfer Pump to Equipment or Storage Tanks Above the Lowest Floor
1305.9.12 Fuel-Oil Piping and Storage, Pipe Size; Without Fuel Storage Above the Lowest Floor
In systems with equipment above the lowest floor, where such equipment is designed to operate utilizing fuel pumped as needed from the lowest floor ...
NYC Mechanical Code 2008 > 13 Fuel-Oil Piping and Storage > 1305 Fuel-Oil System Installation > 1305.9 Supplemental Requirements for Piping From Transfer Pumps to Equipment or Storage Tanks Above Lowest Floor > 1305.9.12 Pipe Size; Without Fuel Storage Above the Lowest Floor
1305.9.11 Fuel-Oil Piping and Storage, Pipe Size; Fuel Storage Above the Lowest Floor
In systems with equipment above the lowest floor where such equipment is designed to operate utilizing fuel stored above the lowest floor, piping ...
NYC Mechanical Code 2014 > 13 Fuel-Oil Piping and Storage > 1305 Fuel-Oil System Installation > 1305.9 Supplemental Requirements for Piping From Transfer Pumps to Equipment or Storage Tanks Above Lowest Floor > 1305.9.11 Pipe Size; Fuel Storage Above the Lowest Floor
1305.9.11 Fuel-Oil Piping and Storage, Pipe Size; Fuel Storage Above the Lowest Floor
In systems with equipment above the lowest floor where such equipment is designed to operate utilizing fuel stored above the lowest floor, piping ...
NYC Mechanical Code 2008 > 13 Fuel-Oil Piping and Storage > 1305 Fuel-Oil System Installation > 1305.9 Supplemental Requirements for Piping From Transfer Pumps to Equipment or Storage Tanks Above Lowest Floor > 1305.9.11 Pipe Size; Fuel Storage Above the Lowest Floor