• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects
    Architects
    General Contractors
    General Contractors
    Building Official & Plans Examiners
    Building Official & Plans Examiners
    Inspectors
    Inspectors
    Owners
    Owners
    Subcontractors
    Subcontractors
    Code Consultants
    Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

[F] 417.2 Piping Clearance

Building Code 2021 of Illinois > 4 Special Detailed Requirements Based on Occupancy and Use > 417 Drying Rooms > 417.2 Piping Clearance
JUMP TO FULL CODE CHAPTER
Overhead heating pipes shall have a clearance of not less than 2 inches (51 mm) from combustible contents in the dryer.

Related Code Sections


417.2 Special Detailed Requirements Based on Occupancy and Use, Piping Clearance
Overhead heating pipes shall have a clearance of not less than 2 inches (51 mm) from combustible contents in the dryer ...
Building Code 2021 of Illinois > 4 Special Detailed Requirements Based on Occupancy and Use > 417 Drying Rooms > 417.2 Piping Clearance
417.2 Special Detailed Requirements Based on Occupancy and Use, Piping Clearance
Overhead heating pipes shall have a clearance of not less than 2 inches (51 mm) from combustible contents in the dryer ...
Building Code 2018 of Illinois > 4 Special Detailed Requirements Based on Occupancy and Use > 417 Drying Rooms > 417.2 Piping Clearance
18.4* Installation Requirements for Seismic Protection, Clearance
Clearance shall be provided around all piping extending through walls, floors, platforms, and foundations, including drains, fire department ...
Standard for the Installation of Sprinkler Systems 2019 of Illinois > 18 Installation Requirements for Seismic Protection > 18.4* Clearance
5.9.8.2 Special Application Elevators,
Requirement 2.8.3 does not apply. (a) All pipes shall be secured to prevent interference with the elevator equipment. (b) The clearance between ...
Safety Code for Elevators and Escalators 2019 of Illinois > 5 Special Application Elevators > 5.9 Mine Elevators > 5.9.8 Equipment in Hoistways, Machinery Spaces, Machine Rooms, Control Spaces, and Control Rooms > 5.9.8.2
(C) Wiring Methods and Materials, Clearance From Piping, Exposed Conductors, and So Forth
Conductors shall comply with 398.19 for clearances from other exposed conductors, piping, and so forth ...
National Electrical Code 2017 of Illinois > 3 Wiring Methods and Materials > 394 Concealed Knob-And-Tube Wiring > 394.19 Clearances > (C) Clearance From Piping, Exposed Conductors, and So Forth
Help Contact Us Privacy Terms
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code Compare
Code Compare
Highlight differences between any two building codes.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL PRICING