§34-01 Phase-In of New Standards for Electrical Work
JUMP TO FULL CODE CHAPTER
In accordance with subdivision a of section 27-3024 of the administrative code, the commissioner hereby extends the date of application of the electrical code technical standards as hereinafter provided. During the period from January 1, 2003 through June 30, 2003 (the phase-in period) electrical work, including low voltage electrical work, may be performed either in accordance with the electrical code technical standards adopted pursuant to section 27-3024 of the administrative code or in accordance with the standards set forth in subchapter 2 of chapter 3 of title 27 of the administrative code as in effect prior to January 1, 2003, and the Bulletins, Code Committee Interpretations and rules issued pursuant to such subchapter (the old electrical code) at the option of the licensed master or special electrician or other authorized person performing the work. On and after July 1, 2003 all electrical work shall be performed in accordance with the electrical code technical standards.
Related Code Sections
Appendix A Selected Rules of the Department of Buildings [PDF] (page 110)
Code Technical Standards §34-01 Phase-in of new standards for electrical work. In accordance with subdivision a of section 27-3024 ...
Appendix A Selected Rules of the Department of Buildings [PDF] (page 4)
Subchapter A Phase-in of Electrical Code Technical Standards Phase-in of New Standards for Electrical Work Review of Applications for Electrical ...
Reference Standard 18 Elevators and Conveyors [PDF] (page 10)
) Applications filed for the installation or modification of Phase II Emergency In-Car Operations/Fireman’s Service in existing elevators for which a permit ...
§28-104.2.5 Administration, Phased or Partial Approval
In the case of construction documents for the construction of new buildings or the alteration of buildings, the commissioner may grant partial ...
NYC General Admin. Provisions 2014 > 1 Administration > 104 Construction Documents > *§28-104.2 Application for Approval of Construction Documents > §28-104.2.5 Phased or Partial Approval
§28-104.2.5 Administration, Phased or Partial Approval
In the case of construction documents for the construction of new buildings or the alteration of buildings, the commissioner may grant partial ...
NYC General Admin. Provisions 2008 > 1 Administration > 104 Construction Documents > §28-104.2 Application for Approval of Construction Documents > §28-104.2.5 Phased or Partial Approval