• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects
    Architects
    General Contractors
    General Contractors
    Building Official & Plans Examiners
    Building Official & Plans Examiners
    Inspectors
    Inspectors
    Owners
    Owners
    Subcontractors
    Subcontractors
    Code Consultants
    Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

[A] 106.5 Permit Issuance

Plumbing Code 2018 of Kansas > 1 Scope and Administration > 106 Permits > 106.5 Permit Issuance
JUMP TO FULL CODE CHAPTER
The application, construction documents and other data filed by an applicant for permit shall be reviewed by the code official. If the code official finds that the proposed work conforms to the requirements of this code and all laws and ordinances applicable thereto, and that the fees specified in Section 106.6 have been paid, a permit shall be issued to the applicant.

[A] 106.5.1 Approved Construction Documents

When the code official issues the permit where construction documents are required, the construction documents shall be endorsed in writing and stamped "APPROVED." Such approved construction documents shall not be changed, modified or altered without authorization from the code official. Work shall be done in accordance with the approved construction documents.
The code official shall have the authority to issue a permit for the construction of a part of a plumbing system before the entire construction documents for the whole system have been submitted or approved, provided that adequate information and detailed statements have been filed complying with all pertinent requirements of this code. The holders of such permit shall proceed at their own risk without assurance that the permit for the entire plumbing system will be granted.

[A] 106.5.2 Validity

The issuance of a permit or approval of construction documents shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of this code or any other ordinance of the jurisdiction. A permit presuming to give authority to violate or cancel the provisions of this code shall not be valid.
The issuance of a permit based on construction documents and other data shall not prevent the code official from thereafter requiring the correction of errors in said construction documents and other data or from preventing building operations being carried on thereunder where in violation of this code or of other ordinances of this jurisdiction.

[A] 106.5.3 Expiration

Every permit issued by the code official under the provisions of this code shall expire by limitation and become null and void if the work authorized by such permit is not commenced within 180 days from the date of such permit, or if the work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days. Before such work can be recommenced, a new permit shall be first obtained and the fee therefor shall be one-half the amount required for a new permit for such work, provided that changes have not been made and will not be made in theoriginal construction documents for such work, and provided further that such suspension or abandonment has not exceeded 1 year.

[A] 106.5.4 Extensions

Any permittee holding an unexpired permit shall have the right to apply for an extension of the time within which the permittee will commence work under that permit when work is unable to be commenced within the time required by this section for good and satisfactory reasons. The code official shall extend the time for action by the permittee for a period not exceeding 180 days if there is reasonable cause. A permit shall not be extended more than once. The fee for an extension shall be one-half the amount required for a new permit for such work.

[A] 106.5.5 Suspension or Revocation of Permit

The code official shall have the authority to suspend or revoke a permit issued under the provisions of this code wherever the permit is issued in error or on the basis of incorrect, inaccurate or incomplete information, or in violation of any ordinance or regulation or any of the provisions of this code.

[A] 106.5.6 Retention of Construction Documents

One set of approved construction documents shall be retained by the code official for a period of not less than 180 days from date of completion of the permitted work, or as required by state or local laws.
One set of approved construction documents shall be returned to the applicant, and said set shall be kept on the site of the building or work at all times during which the work authorized thereby is in progress.

[A] 106.5.7 Previous Approvals

This code shall not require changes in the construction documents, construction or designated occupancy of a structure for which a lawful permit has been heretofore issued or otherwise lawfully authorized, and the construction of which has been pursued in good faith within 180 days after the effective date of this code and has not been abandoned.

[A] 106.5.8 Posting of Permit

The permit or a copy shall be kept on the site of the work until the completion of the project.

Related Code Sections


106.4 Scope and Administration, Permit Issuance
The issuance of a permit or approval of construction documents ...
Mechanical Code 2018 of Kansas > 1 Scope and Administration > 106 Permits > 106.4 Permit Issuance
106.5 Scope and Administration, Permit Issuance
The issuance of a permit or approval of construction documents shall ...
Fuel Gas Code 2018 of Kansas > 1 Scope and Administration > 106 (IFGC) Permits > 106.5 Permit Issuance
106.5 Scope and Administration, Permit Issuance
The issuance of a permit or approval of construction documents shall ...
Plumbing Code 2018 of Kansas > 1 Scope and Administration > 106 Permits > 106.5 Permit Issuance
R108.6 Scope and Administration, Work Commencing Before Permit Issuance
Any person who commences work requiring a permit on a building, structure, electrical, gas, mechanical or plumbing system before obtaining ...
Residential Code 2018 of Kansas > 1 Scope and Administration > R108 Fees > R108.6 Work Commencing Before Permit Issuance
108.4 Scope and Administration, Work Commencing Before Permit Issuance
Any person who commences any work before obtaining the necessary permits shall be subject to an additional fee established by the code official ...
Existing Building Code 2018 of Kansas > 1 Scope and Administration > 108 Fees > 108.4 Work Commencing Before Permit Issuance
Help Contact Us Privacy Terms
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code Compare
Code Compare
Highlight differences between any two building codes.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL PRICING