• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects
    Architects
    General Contractors
    General Contractors
    Building Official & Plans Examiners
    Building Official & Plans Examiners
    Inspectors
    Inspectors
    Owners
    Owners
    Subcontractors
    Subcontractors
    Code Consultants
    Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

105.4.1 Permit Intent

2020 FBC - Building, 7th edition > 1 Scope and Administration > 105 Permits > 105.4 Conditions of the Permit > 105.4.1 Permit Intent
JUMP TO FULL CODE CHAPTER
A permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter or set aside any of the provisions of the technical codes, nor shall issuance of a permit prevent the building official from thereafter requiring a correction of errors in plans, construction or violations of this code. Every permit issued shall become invalid unless the work authorized by such permit is commenced within 6 months after its issuance, or if the work authorized by such permit is suspended or abandoned for a period of 6 months after the time the work is commenced.

105.4.1.1

If work has commenced and the permit is revoked, becomes null and void, or expires because of lack of progress or abandonment, a new permit covering the proposed construction shall be obtained before proceeding with the work.

105.4.1.2

If a new permit is not obtained within 180 days from the date the initial permit became null and void, the building official is authorized to require that any work which has been commenced or completed be removed from the building site. Alternately, a new permit may be issued on application, providing the work in place and required to complete the structure meets all applicable regulations in effect at the time the initial permit became null and void and any regulations which may have become effective between the date of expiration and the date of issuance of the new permit.

105.4.1.3

Work shall be considered to be in active progress when the permit has received an approved inspection within 180 days. This provision shall not be applicable in case of civil commotion or strike or when the building work is halted due directly to judicial injunction, order or similar process.

105.4.1.4

The fee for renewal reissuance and extension of a permit shall be set forth by the administrative authority.

Related Code Sections


105.4.1 Scope and Administration, Permit Intent
A permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter or set aside any ...
2014 FBC - Building, 5th edition > 1 Scope and Administration > 105 Permits > 105.4 Conditions of the Permit > 105.4.1 Permit Intent
105.4.1 Scope and Administration, Permit Intent
A permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter or set aside any ...
2020 FBC - Building, 7th edition > 1 Scope and Administration > 105 Permits > 105.4 Conditions of the Permit > 105.4.1 Permit Intent
105.4.1 Scope and Administration, Permit Intent
A permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter or set aside any ...
2017 FBC - Building, 6th edition > 1 Scope and Administration > 105 Permits > 105.4 Conditions of the Permit > 105.4.1 Permit Intent
105.4.1 Scope and Administration, Permit Intent
A permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter or set aside any ...
2020 FBC - Residential, 7th edition > 1 Scope and Administration > 105 Permits > 105.4 Conditions of the Permit > 105.4.1 Permit Intent
105.4.1 Scope and Administration, Permit Intent
A permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter or set aside any ...
2020 FBC - Existing Building, 7th edition > 1 Scope and Administration > 105 Permits > 105.4 Conditions of the Permit > 105.4.1 Permit Intent
Help Contact Us Privacy Terms
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code Compare
Code Compare
Highlight differences between any two building codes.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL PRICING