Emergency preparedness plans and building information cards shall be reviewed and updated as necessitated by changes in staff assignments, use or occupancy, or the design and arrangement of the premises, but at least annually. An entry shall be made in the log book required by FC401.8 documenting such review, and indicating the general nature of any amendments to be made to such plan. Submission of an amended emergency preparedness plan shall not be required solely by reason of staffing changes or revisions to the building information card. Fire and emergency preparedness guides and notices shall be reviewed prior to each distribution required by this code or the rules, and shall be revised within 60 days of any change in building construction or service equipment materially affecting the content of such guide or notice.

Related Code Sections

1618.8.3 Structural Design, Revisions of Design
of the peer review. The structural peer reviewer shall review the items that have been affected and shall revise the structural peer review report ...
1818.6.3 Soils and Foundations, Revisions of Design
to the scope of the peer review. The geotechnical peer reviewer shall review the items that have been affected and shall revise the geotechnical peer ...
§28-104.2.7 Administration, Time Period for Review
notification to the applicant, extend such time for an additional 20 calendar days. Such time period for review shall commence in accordance ...
§28-104.2.7 Administration, Time Period for Review
notification to the applicant, extend such time for an additional 20 calendar days. Such time period for review shall commence in accordance ...
§28-104.2.7 Administration, Time Period for Review
to the applicant, extend such time for an additional 20 calendar days.   2. Such time period for review shall commence in accordance with article ...