• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects
    Architects
    General Contractors
    General Contractors
    Building Official & Plans Examiners
    Building Official & Plans Examiners
    Inspectors
    Inspectors
    Owners
    Owners
    Subcontractors
    Subcontractors
    Code Consultants
    Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

1910.66(h)(4) Periodic Reshackling of Suspension Wire Ropes

OSHA 1910 General Industry > F Powered Platforms, Manlifts, and Vehicle-Mounted Work Platforms > 1910.66 Powered Platforms for Building Maintenance > 1910.66(h) Maintenance > 1910.66(h)(4) Periodic Reshackling of Suspension Wire Ropes
JUMP TO FULL CODE CHAPTER
The hoisting ropes shall be reshackled at the nondrum ends at intervals not exceeding 24 months. When reshackling the ropes, a sufficient length shall be cut from the end of the rope to remove damaged or fatigued portions.

Related Code Sections


1910.66(h)(4) Powered Platforms, Manlifts, and Vehicle-Mounted Work Platforms, Periodic Reshackling of Suspension Wire Ropes
The hoisting ropes shall be reshackled at the nondrum ends at intervals not exceeding 24 months. When reshackling the ropes, a sufficient length ...
OSHA 1910 General Industry > F Powered Platforms, Manlifts, and Vehicle-Mounted Work Platforms > 1910.66 Powered Platforms for Building Maintenance > 1910.66(h) Maintenance > 1910.66(h)(4) Periodic Reshackling of Suspension Wire Ropes
1910.66(g) Powered Platforms, Manlifts, and Vehicle-Mounted Work Platforms,
Suspension wire rope shall be maintained and used in accordance ...
OSHA 1910 General Industry > F Powered Platforms, Manlifts, and Vehicle-Mounted Work Platforms > 1910.66 Powered Platforms for Building Maintenance > 1910.66(g)
1910.66(f)(3)(ii) Powered Platforms, Manlifts, and Vehicle-Mounted Work Platforms, Transportable Outriggers
transportable outrigger shall be so located that the suspension wire ropes for two point suspended working platforms are hung parallel ...
OSHA 1910 General Industry > F Powered Platforms, Manlifts, and Vehicle-Mounted Work Platforms > 1910.66 Powered Platforms for Building Maintenance > 1910.66(f) Powered Platform Installations-Equipment > 1910.66(f)(3) Suspension Methods > 1910.66(f)(3)(ii) Transportable Outriggers
1910.66(f)(5)(ii)(M) Powered Platforms, Manlifts, and Vehicle-Mounted Work Platforms,
employee on a working platform suspended by two or more wire ropes, if the failure of one wire rope or suspension attachment will cause the platform to upset ...
OSHA 1910 General Industry > F Powered Platforms, Manlifts, and Vehicle-Mounted Work Platforms > 1910.66 Powered Platforms for Building Maintenance > 1910.66(f) Powered Platform Installations-Equipment > 1910.66(f)(5) Suspended Equipment > 1910.66(f)(5)(ii) Two and Four-Point Suspended Working Platforms > 1910.66(f)(5)(ii)(M)
1910.268(n)(5) Special Industries, Test Requirements for Cable Suspension Strand
, shall be thrown over the strand. On joint lines, the rope shall be passed over the strand using tree pruner handles or a wire raising tool. If two ...
OSHA 1910 General Industry > R Special Industries > 1910.268 Telecommunications > 1910.268(n) Overhead Lines > 1910.268(n)(5) Test Requirements for Cable Suspension Strand
Help Contact Us Privacy Terms
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code Compare
Code Compare
Highlight differences between any two building codes.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL PRICING