// CODE SNIPPET
14.2.2.1 Performance Verification
JUMP TO FULL CODE CHAPTER
To ensure operational integrity, the system shall have an inspection, testing, and maintenance program.
Inspection, testing, and maintenance programs shall satisfy the requirements of this Code and conform to the equipment manufacturer's published instructions.
Inspection, testing, and maintenance programs shall verify correct operation of the system.
Related Code Sections
14.2.2.1 Inspection, Testing, and Maintenance, Performance Verification
To ensure operational integrity, the system shall have an inspection, testing, and maintenance program ...
National Fire Alarm and Signaling Code 2019 of Maine > 14 Inspection, Testing, and Maintenance > 14.2 General > 14.2.2 Performance > 14.2.2.1 Performance Verification
5.9.2.1 Building Envelope, Building Envelope Performance Verification
The performance of the building envelope shall be verified in accordance with this section and Section 4.2.5 ...
Energy Standard for Buildings Except Low-Rise Residential Buildings 2016 of Maine > 5 Building Envelope > 5.9 Inspection and Verification > 5.9.2 Verification > 5.9.2.1 Building Envelope Performance Verification
C402.5.1.5 [CE] Commercial Energy Efficiency, Building Envelope Performance Verification
The installation of the continuous air barrier shall be verified by the code official , a registered design professional or approved agency ...
MUBEC Stretch Code > 4 [CE] Commercial Energy Efficiency > C402 Building Envelope Requirements > C402.5 Air Leakage—Thermal Envelope > C402.5.1 Air Barriers > C402.5.1.5 Building Envelope Performance Verification
38.6.1.5.6.2 Marijuana Growing, Processing, or Extraction Facilities,
The designer of record performing the field verification shall provide a report of findings and observations of the site inspection to the AHJ ...
Fire Code 2018 of Maine > 38 Marijuana Growing, Processing, or Extraction Facilities > 38.6* Processing or Extraction > 38.6.1 General > 38.6.1.5 Systems, Equipment, and Processes > 38.6.1.5.6 Equipment Field Verification > 38.6.1.5.6.2
7.5.8.2 Documentation,
Verification of compliant installation shall be performed according to testing requirements and procedures specified in 14.4.1 and 14.4.2 ...
National Fire Alarm and Signaling Code 2019 of Maine > 7 Documentation > 7.5 Completion Documentation > 7.5.8* Verification of Compliant Installation. (SIG-FUN) > 7.5.8.2