// CODE SNIPPET
301A.3.3 Performance-Based Method
JUMP TO FULL CODE CHAPTER
Alterations, additions and changes of occupancy to existing buildings or structures complying with Sections 303A.3.4 and 303A.3.5 of this code shall be considered in compliance with the provisions of this code.
Related Code Sections
301A.3.3 Provisions for All Compliance Methods, Performance-Based Method
Alterations, additions and changes of occupancy to existing buildings or structures complying with Sections 303A.3.4 and 303A.3.5 of this code ...
California Existing Building Code 2019 > 3A Provisions for All Compliance Methods > 301A Administration > 301A.3 Alteration, Addition or Change of Occupancy > 301A.3.3 Performance-Based Method
303A.3.4 Provisions for All Compliance Methods, Performance Objectives of Performance-Based Methods
not include seismic forces are required, the new building code provisions of this code shall be applicable. Required building performance objectives under ASCE ...
California Existing Building Code 2019 > 3A Provisions for All Compliance Methods > 303A Structural Design Loads and Evaluation and Design Procedures > 303A.3 Additions, Alterations, Repairs and Seismic Retrofit to Existing Buildings or Structures > 303A.3.4 Performance Objectives of Performance-Based Methods
303A.3.4.4 Provisions for All Compliance Methods, SPC 2 Using ASCE 41
of the following are satisfied: Life Safety Structural Performance Level (S-3) in accordance with Section 2.3.1.3 of ASCE 41 at BSE-1E; and Items ...
California Existing Building Code 2019 > 3A Provisions for All Compliance Methods > 303A Structural Design Loads and Evaluation and Design Procedures > 303A.3 Additions, Alterations, Repairs and Seismic Retrofit to Existing Buildings or Structures > 303A.3.4 Performance Objectives of Performance-Based Methods > 303A.3.4.4 SPC 2 Using ASCE 41
303A.3.4.5 Provisions for All Compliance Methods, SPC-4D Using ASCE 41
of the following are satisfied:
Damage control Structural Performance Level (S-2) in accordance with Section 2.3.1.2.1 of ASCE 41 at BSE-1E ...
California Existing Building Code 2019 > 3A Provisions for All Compliance Methods > 303A Structural Design Loads and Evaluation and Design Procedures > 303A.3 Additions, Alterations, Repairs and Seismic Retrofit to Existing Buildings or Structures > 303A.3.4 Performance Objectives of Performance-Based Methods > 303A.3.4.5 SPC-4D Using ASCE 41
303A.3.4.7 Provisions for All Compliance Methods, NPC-2 and NPC-3 Using ASCE 41:
Operational Nonstructural Performance Level (N-A) and Position Retention Nonstructural Performance Level (N-B) of ASCE 41 at BSE-1N shall ...
California Existing Building Code 2019 > 3A Provisions for All Compliance Methods > 303A Structural Design Loads and Evaluation and Design Procedures > 303A.3 Additions, Alterations, Repairs and Seismic Retrofit to Existing Buildings or Structures > 303A.3.4 Performance Objectives of Performance-Based Methods > 303A.3.4.7 NPC-2 and NPC-3 Using ASCE 41: