// CODE SNIPPET
5.410.2.1 Owner's or Owner Representative's Project Requirements (OPR)
JUMP TO FULL CODE CHAPTER
[N] The expectations and requirements of the building appropriate to its phase shall be documented before the design phase of the project begins. This documentation shall include the following:
- Environmental and sustainability goals.
- Building sustainable goals.
- Indoor environmental quality requirements.
- Project program, including facility functions and hours of operation, and need for after hours operation.
- Equipment and systems expectations.
- Building occupant and operation and maintenance (O&M) personnel expectations.
Related Code Sections
5.410.2.1 Nonresidential Mandatory Measures, Owner's or Owner Representative's Project Requirements (OPR)
[N] The expectations and requirements of the building appropriate to its phase shall be documented before the design phase of the project begins ...
California Green Building Standards Code 2019 > 5 Nonresidential Mandatory Measures > 5.410 Building Maintenance and Operation > 5.410.2 Commissioning. [N] New Buildings 10,000 Square Feet and Over > 5.410.2.1 Owner's or Owner Representative's Project Requirements (OPR)
5.410.2.1 Nonresidential Mandatory Measures, Owner's or Owner Representative's Project Requirements (OPR)
[N] The expectations and requirements of the building appropriate to its phase shall be documented before the design phase of the project begins ...
California Green Building Standards Code 2016 > 5 Nonresidential Mandatory Measures > 5.410 Building Maintenance and Operation > 5.410.2 Commissioning. [N] New Buildings 10,000 Square Feet and Over > 5.410.2.1 Owner's or Owner Representative's Project Requirements (OPR)
Section 120.8 Nonresidential, High-Rise Residential Hotel/Motel Occupancies, and Covered Processes—Mandatory Requirements, Nonresidential Building Commissioning
; Documentation and training; and Commissioning report. (b) Owner's or Owner Representative's Project Requirements (OPR). The energy-related ...
California Energy Code 2016 > 3 Nonresidential, High-Rise Residential Hotel/Motel Occupancies, and Covered Processes—Mandatory Requirements > 120.8 Nonresidential Building Commissioning
Section 120.8 Nonresidential, High-Rise Residential Hotel/Motel Occupancies, and Covered Processes — Mandatory Requirements, Nonresidential Building Commissioning
: Owner's or owner representative's project requirements; Basis of design; Design phase design review; Commissioning measures shown ...
California Energy Code 2019 > 3 Nonresidential, High-Rise Residential Hotel/Motel Occupancies, and Covered Processes — Mandatory Requirements > 120.8 Nonresidential Building Commissioning
Chapter 8 Compliance Forms, Worksheets and Reference Material
Project Requirements
CALGreen Section 5.410.2.1, Owner's or Owner representative's Project Requirements (OPR) .
1.1 Intent: The Owner's ...
California Green Building Standards Code 2019 > 8 Compliance Forms, Worksheets and Reference Material