• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects
    Architects
    General Contractors
    General Contractors
    Building Official & Plans Examiners
    Building Official & Plans Examiners
    Inspectors
    Inspectors
    Owners
    Owners
    Subcontractors
    Subcontractors
    Code Consultants
    Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

1926.1404(q) Outriggers and Stabilizers

OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1404 Assembly/Disassembly--General Requirements (Applies to All Assembly and Disassembly Operations) > 1926.1404(q) Outriggers and Stabilizers
JUMP TO FULL CODE CHAPTER
When the load to be handled and the operating radius require the use of outriggers or stabilizers, or at any time when outriggers or stabilizers are used, all of the following requirements must be met (except as otherwise indicated):

1926.1404(q)(1)

The outriggers or stabilizers must be either fully extended or, if manufacturer procedures permit, deployed as specified in the load chart.

1926.1404(q)(2)

The outriggers must be set to remove the equipment weight from the wheels, except for locomotive cranes (see paragraph (q)(6) of this section for use of outriggers on locomotive cranes). This provision does not apply to stabilizers.

1926.1404(q)(3)

When outrigger floats are used, they must be attached to the outriggers. When stabilizer floats are used, they must be attached to the stabilizers.

1926.1404(q)(4)

Each outrigger or stabilizer must be visible to the operator or to a signal person during extension and setting.

1926.1404(q)(5) Outrigger and Stabilizer Blocking Must:

1926.1404(q)(5)(i)

Meet the requirements in paragraphs (h)(2) and (h)(3) of this section.

1926.1404(q)(5)(ii)

Be placed only under the outrigger or stabilizer float/pad of the jack or, where the outrigger or stabilizer is designed without a jack, under the outer bearing surface of the extended outrigger or stabilizer beam.

1926.1404(q)(6)

For locomotive cranes, when using outriggers or stabilizers to handle loads, the manufacturer's procedures must be followed. When lifting loads without using outriggers or stabilizers, the manufacturer's procedures must be met regarding truck wedges or screws.

Related Code Sections


1926.1404(q) Cranes & Derricks in Construction, Outriggers and Stabilizers
When the load to be handled and the operating radius require the use of outriggers or stabilizers, or at any time when outriggers or stabilizers ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1404 Assembly/Disassembly--General Requirements (Applies to All Assembly and Disassembly Operations) > 1926.1404(q) Outriggers and Stabilizers
1926.1416(e)(5)(i) Cranes & Derricks in Construction,
Outrigger/stabilizer position (horizontal beam extension) sensor/monitor if the equipment has outriggers or stabilizers. Temporary alternative ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1416 Operational Aids > 1926.1416(e) Category II Operational Aids and Alternative Measures > 1926.1416(e)(5) > 1926.1416(e)(5)(i)
1926.1431(c)(2) Cranes & Derricks in Construction,
Equipment with outriggers or stabilizers must have them all extended and locked. The amount of extension must be the same for all outriggers ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1431 Hoisting Personnel > 1926.1431(c) Equipment Set-Up > 1926.1431(c)(2)
1926.1431(c) Cranes & Derricks in Construction, Equipment Set-Up
or stabilizers must have them all extended and locked. The amount of extension must be the same for all outriggers and stabilizers and in accordance ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1431 Hoisting Personnel > 1926.1431(c) Equipment Set-Up
1926.1404(q)(3) Cranes & Derricks in Construction,
When outrigger floats are used, they must be attached to the outriggers. When stabilizer floats are used, they must be attached to the stabilizers ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1404 Assembly/Disassembly--General Requirements (Applies to All Assembly and Disassembly Operations) > 1926.1404(q) Outriggers and Stabilizers > 1926.1404(q)(3)
Help Contact Us Privacy Terms
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code Compare
Code Compare
Highlight differences between any two building codes.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL PRICING