• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects
    Architects
    General Contractors
    General Contractors
    Building Official & Plans Examiners
    Building Official & Plans Examiners
    Inspectors
    Inspectors
    Owners
    Owners
    Subcontractors
    Subcontractors
    Code Consultants
    Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

Section 5.508 Outdoor Air Quality

California Green Building Standards Code 2019 > 5 Nonresidential Mandatory Measures > 5.508 Outdoor Air Quality
JUMP TO FULL CODE CHAPTER

5.508.1 Ozone Depletion and Greenhouse Gas Reductions

Installations of HVAC, refrigeration and fire suppression equipment shall comply with Sections 5.508.1.1 and 5.508.1.2.

5.508.1.1 Chlorofluorocarbons (CFCS)

Install HVAC, refrigeration and fire suppression equipment that do not contain CFCs.

5.508.1.2 Halons

Install HVAC, refrigeration and fire suppression equipment that do not contain Halons.

5.508.2 Supermarket Refrigerant Leak Reduction

New commercial refrigeration systems shall comply with the provisions of this section when installed in retail food stores 8,000 square feet or more conditioned area, and that utilize either refrigerated display cases, or walk-in coolers or freezers connected to remote compressor units or condensing units. The leak reduction measures apply to refrigeration systems containing high-global-warming potential (high-GWP) refrigerants with a GWP of 150 or greater. New refrigeration systems include both new facilities and the replacement of existing refrigeration systems in existing facilities.
Exception: Refrigeration systems containing low-global warming potential (low-GWP) refrigerant with a GWP value less than 150 are not subject to this section. Low-GWP refrigerants are nonozone-depleting refrigerants that include ammonia, carbon dioxide (CO2), and potentially other refrigerants.

5.508.2.1 Refrigerant Piping

Piping compliant with the California Mechanical Code shall be installed to be accessible for leak protection and repairs. Piping runs using threaded pipe, copper tubing with an outside diameter (OD) less than 1/4 inch, flared tubing connections and short radius elbows shall not be used in refrigerant systems except as noted below.

5.508.2.1.1 Threaded Pipe

Threaded connections are permitted at the compressor rack.

5.508.2.1.2 Copper Pipe

Copper tubing with an OD less than 1/4 inch may be used in systems with a refrigerant charge of 5 pounds or less.

5.508.2.1.2.1 Anchorage

One-fourth-inch OD tubing shall be securely clamped to a rigid base to keep vibration levels below 8 mils.

5.508.2.1.3 Flared Tubing Connections

Double-flared tubing connections may be used for pressure controls, valve pilot lines and oil.
Exception: Single-flared tubing connections may be used with a multiring seal coated with industrial sealant suitable for use with refrigerants and tightened in accordance with manufacturer's recommendations.

5.508.2.1.4 Elbows

Short radius elbows are only permitted where space limitations prohibit use of long radius elbows.

5.508.2.2 Valves

Valves and fittings shall comply with the California Mechanical Code and as follows.

5.508.2.2.1 Pressure Relief Valves

For vessels containing high-GWP refrigerant, a rupture disc shall be installed between the outlet of the vessel and the inlet of the pressure relief valve.

5.508.2.2.1.1 Pressure Detection

A pressure gauge, pressure transducer or other device shall be installed in the space between the rupture disc and the relief valve inlet to indicate a disc rupture or discharge of the relief valve.

5.508.2.2.2 Access Valves

Only Schrader access valves with a brass or steel body are permitted for use.

5.508.2.2.2.1 Valve Caps

For systems with a refrigerant charge of 5 pounds or more, valve caps shall be brass or steel and not plastic.

5.508.2.2.2.2 Seal Caps

If designed for it, the cap shall have a neoprene O-ring in place.

5.508.2.2.2.2.1 Chain Tethers

Chain tethers to fit over the stem are required for valves designed to have seal caps.
Exception: Valves with seal caps that are not removed from the valve during stem operation.

5.508.2.3 Refrigerated Service Cases

Refrigerated service cases holding food products containing vinegar and salt shall have evaporator coils of corrosion-resistant material, such as stainless steel; or be coated to prevent corrosion from these substances.

5.508.2.3.1 Coil Coating

Consideration shall be given to the heat transfer efficiency of coil coating to maximize energy efficiency.

5.508.2.4 Refrigerant Receivers

Refrigerant receivers with capacities greater than 200 pounds shall be fitted with a device that indicates the level of refrigerant in the receiver.

5.508.2.5 Pressure Testing

The system shall be pressure tested during installation prior to evacuation and charging.

5.508.2.5.1 Minimum Pressure

The system shall be charged with regulated dry nitrogen and appropriate tracer gas to bring system pressure up to 300 psig minimum.

5.508.2.5.2 Leaks

Check the system for leaks, repair any leaks, and retest for pressure using the same gauge.

5.508.2.5.3 Allowable Pressure Change

The system shall stand, unaltered, for 24 hours with no more than a +/- one pound pressure change from 300 psig, measured with the same gauge.

5.508.2.6 Evacuation

The system shall be evacuated after pressure testing and prior to charging.

5.508.2.6.1 First Vacuum

Pull a system vacuum down to at least 1000 microns (+/- 50 microns), and hold for 30 minutes.

5.508.2.6.2 Second Vacuum

Pull a second system vacuum to a minimum of 500 microns and hold for 30 minutes.

5.508.2.6.3 Third Vacuum

Pull a third vacuum down to a minimum of 300 microns, and hold for 24 hours with a maximum drift of 100 microns over a 24-hour period.

Related Code Sections


Section 4.508 Residential Mandatory Measures, Outdoor Air Quality
(Reserved ...
California Green Building Standards Code 2019 > 4 Residential Mandatory Measures > 4.508 Outdoor Air Quality
Section 4.508 Residential Mandatory Measures, Outdoor Air Quality
(Reserved ...
California Green Building Standards Code 2016 > 4 Residential Mandatory Measures > 4.508 Outdoor Air Quality
Section 5.508 Nonresidential Mandatory Measures, Outdoor Air Quality
Installations of HVAC, refrigeration and fire suppression equipment shall comply with Sections 5.508.1.1 and 5.508.1.2 ...
California Green Building Standards Code 2019 > 5 Nonresidential Mandatory Measures > 5.508 Outdoor Air Quality
Section 5.508 Nonresidential Mandatory Measures, Outdoor Air Quality
Installations of HVAC, refrigeration and fire suppression equipment shall comply with Sections 5.508.1.1 and 5.508.1.2 ...
California Green Building Standards Code 2016 > 5 Nonresidential Mandatory Measures > 5.508 Outdoor Air Quality
Section A4.508 Residential Voluntary Measures, Outdoor Air Quality
(Reserved ...
California Green Building Standards Code 2016 > A4 Residential Voluntary Measures > A4.508 Outdoor Air Quality
Help Contact Us Privacy Terms
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code Compare
Code Compare
Highlight differences between any two building codes.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL PRICING