// CODE SNIPPET
606.1.2 Operator Inspection After Repairs
JUMP TO FULL CODE CHAPTER
After any repairs are made to a refrigerating system the operation of which requires supervision by a certificate of qualification holder, the certificate of qualification holder shall check the repairs, together with the functioning of all control devices and the positioning of all valves. Such certificate of qualification holder shall also be present when the system is restarted after repairs.
Related Code Sections
§27-798 Heating and Combustion Equipment, Operators Inspection After Repairs
After any repairs are made to a boiler or fuel burning equipment for which licensed or qualified operators are required, such operators shall check ...
NYC 1968 Code (Vol I) > 14 Heating and Combustion Equipment > 3 Licenses and Certificates > §27-798 Operators Inspection After Repairs
*§28-304.6.6 Maintenance of Buildings, Repair
All defects as found in such inspection and test reports shall be corrected within 120 days after the date of inspection and test, except all ...
NYC General Admin. Provisions 2008 > 3 Maintenance of Buildings > 304 Periodic Inspection of Elevators > §28-304.6 Inspection and Testing Process > *§28-304.6.6 Repair
§28-304.6.6 Maintenance of Buildings, Repair
All defects as found in such inspection and test reports shall be corrected within 120 days after the date of inspection and test, except all ...
NYC General Admin. Provisions 2014 > 3 Maintenance of Buildings > 304 Elevators and Conveying Systems > §28-304.6 Inspection and Testing Process > §28-304.6.6 Repair
§28-304.6.6 Maintenance of Buildings, Periodic Inspection and Category Testing Repair
within 90 days after the date of inspection. The department may grant an extension of 45 days upon submission of an application by the owner ...
NYC General Admin. Provisions 2022 > 3 Maintenance of Buildings > 304 Elevators and Conveying Systems > §28-304.6 Inspection and Testing Process > §28-304.6.6 Periodic Inspection and Category Testing Repair
§28-314.3.6 Maintenance of Buildings, Repair
All defects and violations identified during the inspection and testing process shall be corrected immediately prior to continuing the operation ...
NYC General Admin. Provisions 2014 > 3 Maintenance of Buildings > 314 Periodic Wastewater Recycling System Inspection and Testing > §28-314.3 Inspection and Testing Process > §28-314.3.6 Repair