• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects
    Architects
    General Contractors
    General Contractors
    Building Official & Plans Examiners
    Building Official & Plans Examiners
    Inspectors
    Inspectors
    Owners
    Owners
    Subcontractors
    Subcontractors
    Code Consultants
    Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

606.1.2 Operator Inspection After Repairs

NYC Fire Code 2014 > 6 Building Services and Systems > 606 Refrigerating Systems > 606.1 General > 606.1.2 Operator Inspection After Repairs
JUMP TO FULL CODE CHAPTER
After any repairs are made to a refrigerating system the operation of which requires supervision by a certificate of qualification holder, the certificate of qualification holder shall check the repairs, together with the functioning of all control devices and the positioning of all valves. Such certificate of qualification holder shall also be present when the system is restarted after repairs.

Related Code Sections


§27-798 Heating and Combustion Equipment, Operators Inspection After Repairs
After any repairs are made to a boiler or fuel burning equipment for which licensed or qualified operators are required, such operators shall check ...
NYC 1968 Code (Vol I) > 14 Heating and Combustion Equipment > 3 Licenses and Certificates > §27-798 Operators Inspection After Repairs
*§28-304.6.6 Maintenance of Buildings, Repair
All defects as found in such inspection and test reports shall be corrected within 120 days after the date of inspection and test, except all ...
NYC General Admin. Provisions 2008 > 3 Maintenance of Buildings > 304 Periodic Inspection of Elevators > §28-304.6 Inspection and Testing Process > *§28-304.6.6 Repair
§28-304.6.6 Maintenance of Buildings, Repair
All defects as found in such inspection and test reports shall be corrected within 120 days after the date of inspection and test, except all ...
NYC General Admin. Provisions 2014 > 3 Maintenance of Buildings > 304 Elevators and Conveying Systems > §28-304.6 Inspection and Testing Process > §28-304.6.6 Repair
§28-304.6.6 Maintenance of Buildings, Periodic Inspection and Category Testing Repair
within 90 days after the date of inspection. The department may grant an extension of 45 days upon submission of an application by the owner ...
NYC General Admin. Provisions 2022 > 3 Maintenance of Buildings > 304 Elevators and Conveying Systems > §28-304.6 Inspection and Testing Process > §28-304.6.6 Periodic Inspection and Category Testing Repair
§28-314.3.6 Maintenance of Buildings, Repair
All defects and violations identified during the inspection and testing process shall be corrected immediately prior to continuing the operation ...
NYC General Admin. Provisions 2014 > 3 Maintenance of Buildings > 314 Periodic Wastewater Recycling System Inspection and Testing > §28-314.3 Inspection and Testing Process > §28-314.3.6 Repair
Help Contact Us Privacy Terms
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code Compare
Code Compare
Highlight differences between any two building codes.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL PRICING