26.8.3 Operational Tests
Related Code Sections
10.10.2.4 Underground Piping, Operating Test
, the operating tests required by 10.10.2.4 shall be completed with the pumps running. [ 24: 10.10.2.4.4] ...
Standard for the Installation of Sprinkler Systems 2013 of New York State > 10 Underground Piping > 10.10 Testing and Acceptance > 10.10.2 Acceptance Requirements > 10.10.2.4 Operating Test
10.10.2.4 Underground Requirements, Operating Test
fire service main, the operating tests required by 10.10.2.4 shall be completed with the pumps running. [ 24: 10.10.2.4.4] ...
Standard for the Installation of Sprinkler Systems 2016 of New York State > 10 Underground Requirements > 10.10 Testing and Acceptance > 10.10.2 Acceptance Requirements > 10.10.2.4 Operating Test
26.8.3 Marine Systems, Operational Tests
Pressure tank and pump operation, valve actuation, and waterflow shall also be tested ...
Standard for the Installation of Sprinkler Systems 2013 of New York State > 26 Marine Systems > 26.8 System Acceptance > 26.8.3 Operational Tests
26.8.3 Marine Systems, Operational Tests
Pressure tank and pump operation, valve actuation, and waterflow shall also be tested ...
Standard for the Installation of Sprinkler Systems 2016 of New York State > 26 Marine Systems > 26.8 System Acceptance > 26.8.3 Operational Tests
25.2.3 Systems Acceptance, System Operational Tests
). The automatic operation of a deluge or preaction valve shall be tested in accordance ...