• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects
    Architects
    General Contractors
    General Contractors
    Building Official & Plans Examiners
    Building Official & Plans Examiners
    Inspectors
    Inspectors
    Owners
    Owners
    Subcontractors
    Subcontractors
    Code Consultants
    Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

1926.959(b)(3) Operation Without Outriggers

OSHA 1926 Construction > V Electric Power Transmission and Distribution > 1926.959 Mechanical Equipment > 1926.959(b) Outriggers > 1926.959(b)(3) Operation Without Outriggers
JUMP TO FULL CODE CHAPTER
If the work area or the terrain precludes the use of outriggers, the equipment may be operated only within its maximum load ratings specified by the equipment manufacturer for the particular configuration of the equipment without outriggers.

Related Code Sections


1926.959(b)(3) Electric Power Transmission and Distribution, Operation Without Outriggers
If the work area or the terrain precludes the use of outriggers, the equipment may be operated only within its maximum load ratings specified ...
OSHA 1926 Construction > V Electric Power Transmission and Distribution > 1926.959 Mechanical Equipment > 1926.959(b) Outriggers > 1926.959(b)(3) Operation Without Outriggers
1926.1404(q) Cranes & Derricks in Construction, Outriggers and Stabilizers
When the load to be handled and the operating radius require the use of outriggers or stabilizers, or at any time when outriggers or stabilizers ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1404 Assembly/Disassembly--General Requirements (Applies to All Assembly and Disassembly Operations) > 1926.1404(q) Outriggers and Stabilizers
1926.452(i) Scaffolds, Outrigger Scaffolds
The inboard end of outrigger beams, measured from the fulcrum point to the extreme point of anchorage, shall be not less than one and one-half times ...
OSHA 1926 Construction > L Scaffolds > 1926.452 Additional Requirements Applicable to Specific Types of Scaffolds > 1926.452(i) Outrigger Scaffolds
1926.1404(q)(6) Cranes & Derricks in Construction,
without using outriggers or stabilizers, the manufacturer's procedures must be met regarding truck wedges or screws ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1404 Assembly/Disassembly--General Requirements (Applies to All Assembly and Disassembly Operations) > 1926.1404(q) Outriggers and Stabilizers > 1926.1404(q)(6)
1926.1416(e)(5)(i) Cranes & Derricks in Construction,
measures: The operator must verify that the position of the outriggers or stabilizers is correct (in accordance with manufacturer procedures) before ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1416 Operational Aids > 1926.1416(e) Category II Operational Aids and Alternative Measures > 1926.1416(e)(5) > 1926.1416(e)(5)(i)
Help Contact Us Privacy Terms
Code Compare
Code Compare
Highlight differences between any two building codes.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL PRICING