• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects
    Architects
    General Contractors
    General Contractors
    Building Official & Plans Examiners
    Building Official & Plans Examiners
    Inspectors
    Inspectors
    Owners
    Owners
    Subcontractors
    Subcontractors
    Code Consultants
    Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

1926.964(b)(10) Operation of Pulling Rig

OSHA 1926 Construction > V Electric Power Transmission and Distribution > 1926.964 Overhead Lines and Live-Line Barehand Work > 1926.964(b) Installing and Removing Overhead Lines > 1926.964(b)(10) Operation of Pulling Rig
JUMP TO FULL CODE CHAPTER
Employees may operate the pulling rig only when it is safe to do so.

Note to paragraph (b)(10): Examples of unsafe conditions include: employees in locations prohibited by paragraph (b)(11) of this section, conductor and pulling line hangups, and slipping of the conductor grip.

Related Code Sections


1926.964(b)(10) Electric Power Transmission and Distribution, Operation of Pulling Rig
Employees may operate the pulling rig only when it is safe to do so. Note to paragraph (b)(10): Examples of unsafe conditions include ...
OSHA 1926 Construction > V Electric Power Transmission and Distribution > 1926.964 Overhead Lines and Live-Line Barehand Work > 1926.964(b) Installing and Removing Overhead Lines > 1926.964(b)(10) Operation of Pulling Rig
1926.1404(r) Cranes & Derricks in Construction, Rigging
In addition to following the requirements in 29 CFR 1926.251 and other requirements in this and other standards applicable to rigging, when rigging ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1404 Assembly/Disassembly--General Requirements (Applies to All Assembly and Disassembly Operations) > 1926.1404(r) Rigging
1926.753 Steel Erection, Hoisting and Rigging
All the provisions of subpart CC apply to hoisting and rigging with the exception of ยง 1926.1431 ...
OSHA 1926 Construction > R Steel Erection > 1926.753 Hoisting and Rigging
1926.1431(g) Cranes & Derricks in Construction, Attachment and Rigging
the bridle legs. Rigging hardware (including wire rope ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1431 Hoisting Personnel > 1926.1431(g) Attachment and Rigging
1926.251(c)(4) Materials Handling, Storage, Use, and Disposal,
: An eye splice made in any wire rope shall have not less than three full tucks. However, this requirement shall not operate to preclude ...
OSHA 1926 Construction > H Materials Handling, Storage, Use, and Disposal > 1926.251 Rigging Equipment for Material Handling > 1926.251(c) Wire Rope > 1926.251(c)(4)
Help Contact Us Privacy Terms
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code Compare
Code Compare
Highlight differences between any two building codes.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL PRICING