• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects
    Architects
    General Contractors
    General Contractors
    Building Official & Plans Examiners
    Building Official & Plans Examiners
    Inspectors
    Inspectors
    Owners
    Owners
    Subcontractors
    Subcontractors
    Code Consultants
    Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

3320.7.2 Operation and Construction

NYC Building Code 2014 > 33 Safeguards During Construction or Demolition > 3320 Material Handling Equipment > 3320.7 Power Buggies > 3320.7.2 Operation and Construction
JUMP TO FULL CODE CHAPTER
Power buggies shall be operated and constructed in accordance with the requirements of Sections 3320.7.2.1 through 3320.7.2.4.

3320.7.2.1 Brakes

Every power buggy shall be provided with brakes and tire surfaces capable of bringing it to a full stop within 25 feet (635 mm) on a level surface that is similar to the one on which it will be used and at full rated load and maximum design speed. Brakes shall be capable of being fixed in engagement to hold the full load stationary on a 25 percent grade.

3320.7.2.2 Accidental Starting

All movement controls of every power buggy shall be so arranged or shielded that they cannot be inadvertently engaged or the buggy accidentally set in motion.

3320.7.2.3 Parking on Grades

No power buggy shall be left unattended on any grade sufficiently steep to cause it to coast if free of engine and brake resistance.

3320.7.2.4 Use on Ramps, Runways and Platforms

Power buggies shall not be used on ramps, runways, or platforms that do not meet the requirements of Section 3315

Related Code Sections


3320.7.2 Safeguards During Construction or Demolition, Operation and Construction
Power buggies shall be operated and constructed in accordance with the requirements of Sections 3320.7.2.1 through 3320.7.2.4 ...
NYC Building Code 2014 > 33 Safeguards During Construction or Demolition > 3320 Material Handling Equipment > 3320.7 Power Buggies > 3320.7.2 Operation and Construction
3320.7.2 Safeguards During Construction or Demolition, Operation and Construction
Power buggies shall be operated and constructed in accordance with the requirements of Section 3320.7.2.1 through 3320.7.2.4 ...
NYC Building Code 2008 > 33 Safeguards During Construction or Demolition > 3320 Material Handling Equipment > 3320.7 Power Buggies > 3320.7.2 Operation and Construction
3320.7.2 Safeguards During Construction or Demolition, Operation and Construction
Power buggies shall be operated and constructed in accordance with the requirements of Sections 3320.7.2.1 through 3320.7.2.4 ...
NYC Building Code 2022 > 33 Safeguards During Construction or Demolition > 3320 Additional Requirements for Certain Material Handling Equipment > 3320.7 Power Buggies > 3320.7.2 Operation and Construction
3304.3.3 Safeguards During Construction or Demolition, Underground Construction Operations
Whenever excavation or drilling, for any purpose, to a depth greater than 100 feet (30 480 mm) is proposed in a block that has any part of its ...
NYC Building Code 2008 > 33 Safeguards During Construction or Demolition > 3304 Excavation > 3304.3 Notification > 3304.3.3 Underground Construction Operations
3320.7.2.3 Safeguards During Construction or Demolition, Parking on Grades
No power buggy shall be left unattended on any grade sufficiently steep to cause it to coast if free of engine and brake resistance ...
NYC Building Code 2008 > 33 Safeguards During Construction or Demolition > 3320 Material Handling Equipment > 3320.7 Power Buggies > 3320.7.2 Operation and Construction > 3320.7.2.3 Parking on Grades
Help Contact Us Privacy Terms
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code Compare
Code Compare
Highlight differences between any two building codes.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL PRICING