• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects
    Architects
    General Contractors
    General Contractors
    Building Official & Plans Examiners
    Building Official & Plans Examiners
    Inspectors
    Inspectors
    Owners
    Owners
    Subcontractors
    Subcontractors
    Code Consultants
    Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

1926.967(c)(2) Opening a Series Loop

OSHA 1926 Construction > V Electric Power Transmission and Distribution > 1926.967 Special Conditions > 1926.967(c) Series Streetlighting > 1926.967(c)(2) Opening a Series Loop
JUMP TO FULL CODE CHAPTER
Before any employee opens a series loop, the employer shall deenergize the streetlighting transformer and isolate it from the source of supply or shall bridge the loop to avoid an open-circuit condition.

Related Code Sections


1926.967(c)(2) Electric Power Transmission and Distribution, Opening a Series Loop
Before any employee opens a series loop, the employer shall deenergize the streetlighting transformer and isolate it from the source of supply ...
OSHA 1926 Construction > V Electric Power Transmission and Distribution > 1926.967 Special Conditions > 1926.967(c) Series Streetlighting > 1926.967(c)(2) Opening a Series Loop
1926.757(b) Steel Erection, Attachment of Steel Joists and Steel Joist Girders
Each end of "K" series steel joists shall be attached to the support structure with a minimum of two 1 / 8 -inch (3 mm) fillet welds 1 inch (25 mm ...
OSHA 1926 Construction > R Steel Erection > 1926.757 Open Web Steel Joists > 1926.757(b) Attachment of Steel Joists and Steel Joist Girders
1926.909 Blasting and the Use of Explosives, Firing the Blast
WARNING SIGNAL - A 1-minute series of long blasts 5 minutes prior to, blast signal. BLAST SIGNAL - A series ...
OSHA 1926 Construction > U Blasting and the Use of Explosives > 1926.909 Firing the Blast
1926.954(b)(2)(ix) Electric Power Transmission and Distribution,
Tool loops shall be situated on the body of a body belt so that the 100 millimeters (4 inches) of the body belt that is in the center of the back ...
OSHA 1926 Construction > V Electric Power Transmission and Distribution > 1926.954 Personal Protective Equipment > 1926.954(b) Fall Protection > 1926.954(b)(2) Work-Positioning Equipment > 1926.954(b)(2)(ix)
1926.909(a) Blasting and the Use of Explosives,
WARNING SIGNAL - A 1-minute series of long blasts 5 minutes prior to, blast signal. BLAST SIGNAL - A series ...
OSHA 1926 Construction > U Blasting and the Use of Explosives > 1926.909 Firing the Blast > 1926.909(a)
Help Contact Us Privacy Terms
Code Compare
Code Compare
Highlight differences between any two building codes.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL PRICING