• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects
    Architects
    General Contractors
    General Contractors
    Building Official & Plans Examiners
    Building Official & Plans Examiners
    Inspectors
    Inspectors
    Owners
    Owners
    Subcontractors
    Subcontractors
    Code Consultants
    Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

1910.262(d) Openers and Pickers

OSHA 1910 General Industry > R Special Industries > 1910.262 Textiles > 1910.262(d) Openers and Pickers
JUMP TO FULL CODE CHAPTER
—

1910.262(d)(1) Beater Guards

When any opening or picker machinery is equipped with a beater, such beater shall be provided with metal covers which will prevent contact with the beater. Such covers shall be provided with an interlock which will prevent the cover from being raised while the machine is in motion and prevent the operation of the machine while the cover is open.

1910.262(d)(2) Cleanout Holes

Cleanout holes within reaching distance of the fan or picker beater shall have their covers securely fastened and they shall not be opened while the machine is in motion.

1910.262(d)(3) Feed Rolls

The feed rolls on all opening and picking machinery shall be covered with a guard designed to prevent the operator from reaching the nip while the machinery is in operation.

1910.262(d)(4) Removal of Foreign Ferrous Material

All textile opener lines shall be equipped with magnetic separators, tramp iron separators, or other means for the removal of foreign ferrous material.

Related Code Sections


1910.262(b)(25) Special Industries, Openers and Pickers
Openers and pickers means a general classification which includes breaker pickers, intermediate pickers, finisher pickers, single process pickers ...
OSHA 1910 General Industry > R Special Industries > 1910.262 Textiles > 1910.262(b) Definitions Applicable to This Section > 1910.262(b)(25) Openers and Pickers
1910.262(b) Special Industries, Definitions Applicable to This Section
Openers and pickers means a general classification which includes breaker pickers, intermediate pickers, finisher pickers, single process ...
OSHA 1910 General Industry > R Special Industries > 1910.262 Textiles > 1910.262(b) Definitions Applicable to This Section
1910.262 Special Industries, Textiles
Openers and pickers means a general classification which includes breaker pickers ...
OSHA 1910 General Industry > R Special Industries > 1910.262 Textiles
1910.104(b)(3)(iv) Hazardous Materials, Openings
At least 10 feet from any opening in adjacent walls of fire resistive structures. Spacing from such structures shall be adequate to permit ...
OSHA 1910 General Industry > H Hazardous Materials > 1910.104 Oxygen > 1910.104(b) Bulk Oxygen Systems > 1910.104(b)(3) Distance Between Systems and Exposures > 1910.104(b)(3)(iv) Openings
1910.265(c)(6)(i) Special Industries, Opening
Doors shall not open directly on or block a flight of stairs, and shall swing in the direction of exit travel ...
OSHA 1910 General Industry > R Special Industries > 1910.265 Sawmills > 1910.265(c) Building Facilities, and Isolated Equipment > 1910.265(c)(6) Emergency Exits Including Doors and Fire Escapes > 1910.265(c)(6)(i) Opening
Help Contact Us Privacy Terms
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code Compare
Code Compare
Highlight differences between any two building codes.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL PRICING