317.3 Open Trenches
JUMP TO FULL CODE CHAPTER
Excavations required to be made for the installation of a mechanical system or part thereof, within the walls of a building, shall be open trench work and shall be kept open until it has been inspected, tested, and accepted.
Related Code Sections
314.3 General Regulations, Open Trenches
trench work and shall be kept open until the piping has been inspected, tested, and accepted ...
Uniform Plumbing Code 2018 of Nevada > 3 General Regulations > 314.0 Trenching, Excavation, and Backfill > 314.3 Open Trenches
317.3 General Regulations, Open Trenches
Excavations required to be made for the installation of a mechanical system or part thereof, within the walls of a building, shall be open trench ...
Uniform Mechanical Code 2018 of Nevada > 3 General Regulations > 317.0 Trenching, Excavation, and Backfill > 317.3 Open Trenches
10.10.2.2.5 Underground Requirements,
Where required for safety measures presented by the hazards of open trenches, the pipe and joints shall be permitted to be backfilled, provided ...
Standard for the Installation of Sprinkler Systems 2016 of Nevada > 10 Underground Requirements > 10.10 Testing and Acceptance > 10.10.2 Acceptance Requirements > 10.10.2.2 Hydrostatic Test > 10.10.2.2.5
H 601.1 Private Sewage Disposal Systems, Distribution Lines
Distribution lines shall be constructed of clay tile laid with open joints, perforated clay pipe, perforated bituminous fiber pipe, perforated high ...
Uniform Plumbing Code 2018 of Nevada > H Private Sewage Disposal Systems > H 601.0 Disposal Fields > H 601.1 Distribution Lines
10.10.2 Underground Requirements, Acceptance Requirements
] Where required for safety measures presented by the hazards of open trenches, the pipe and joints shall be permitted ...
Standard for the Installation of Sprinkler Systems 2016 of Nevada > 10 Underground Requirements > 10.10 Testing and Acceptance > 10.10.2 Acceptance Requirements