• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects
    Architects
    General Contractors
    General Contractors
    Building Official & Plans Examiners
    Building Official & Plans Examiners
    Inspectors
    Inspectors
    Owners
    Owners
    Subcontractors
    Subcontractors
    Code Consultants
    Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

3314.1.1 Notification Prior to Commencement of Work

NYC Building Code 2008 > 33 Safeguards During Construction or Demolition > 3314 Scaffolds > 3314.1 Scope > 3314.1.1 Notification Prior to Commencement of Work
JUMP TO FULL CODE CHAPTER
The permit holder or person directly in charge of any suspended scaffold supported by c-hooks or outrigger beams shall notify the department in a form and manner specified by the department at least 24 hours, but not more than 48 hours, prior to the installation or use of such scaffolding equipment.

Related Code Sections


3314.1.1 Safeguards During Construction or Demolition, Notification Prior to Commencement of Work
in a form and manner specified by the department at least 24 hours, but not more than 48 hours, prior to the installation or use of such scaffolding equipment ...
NYC Building Code 2008 > 33 Safeguards During Construction or Demolition > 3314 Scaffolds > 3314.1 Scope > 3314.1.1 Notification Prior to Commencement of Work
3309.1.1 Safeguards During Construction or Demolition, Notification
be provided to the adjoining property owner at least 60 calendar days prior to the commencement of work. Such notification shall describe the nature ...
NYC Building Code 2014 > 33 Safeguards During Construction or Demolition > 3309 Protection of Adjoining Property > 3309.1 Protection Required > 3309.1.1 Notification
3309.1.1 Safeguards During Construction or Demolition, Notification
be provided to the adjoining property owner at least 60 calendar days prior to the commencement of work. Such notification shall describe the nature ...
NYC Building Code 2022 > 33 Safeguards During Construction or Demolition > 3309 Protection of Adjoining Property > 3309.1 Protection Required > 3309.1.1 Notification
3306.3 Safeguards During Construction or Demolition, Notification
the department via phone or electronically at least 24 hours, but no more than 48 hours prior to the commencement of such work. If the notification date falls ...
NYC Building Code 2022 > 33 Safeguards During Construction or Demolition > 3306 Demolition > 3306.3 Notification
3304.3 Safeguards During Construction or Demolition, Notification
Prior to the commencement of soil or foundation work, notification shall be provided as follows ...
NYC Building Code 2022 > 33 Safeguards During Construction or Demolition > 3304 Soil and Foundation Work > 3304.3 Notification
Help Contact Us Privacy Terms
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code Compare
Code Compare
Highlight differences between any two building codes.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL PRICING