• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects
    Architects
    General Contractors
    General Contractors
    Building Official & Plans Examiners
    Building Official & Plans Examiners
    Inspectors
    Inspectors
    Owners
    Owners
    Subcontractors
    Subcontractors
    Code Consultants
    Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

G107.4 Notification of Risks

NYC Building Code 2014 > G Flood-Resistant Construction > G107 Variances > G107.4 Notification of Risks
JUMP TO FULL CODE CHAPTER
Upon issuance of a variance, the Executive Director of the Boards of Standards and Appeals shall provide written notice to the owner and the applicant that:
  1. The issuance of a variance to construct a structure below the base flood level will result in increased premium rates for flood insurance up to amounts as high as twenty-five dollars for each one hundred dollars of insurance coverage; and
  2. That such construction below the base flood level increases risks to life and property.

Related Code Sections


G107.4 Flood-Resistant Construction, Notification of Risks
increases risks to life and property ...
NYC Building Code 2014 > G Flood-Resistant Construction > G107 Variances > G107.4 Notification of Risks
G107.4 Flood-Resistant Construction, Notification of Risks
increases risks to life and property ...
NYC Building Code 2008 > G Flood-Resistant Construction > G107 Variances > G107.4 Notification of Risks
1006.5.1 Dwelling Units and Sleeping Units, Notification
A hard-wired electric doorbell shall be provided. A button or switch shall be provided on the public side of the unit primary entrance. Activation ...
Accessible and Usable Buildings and Facilities 2009 of New York City > 10 Dwelling Units and Sleeping Units > 1006 Units With Accessible Communication Features > 1006.5 Unit Primary Entrance > 1006.5.1 Notification
3304.3 Safeguards During Construction or Demolition, Notification
Prior to the commencement of soil or foundation work, notification shall be provided as follows ...
NYC Building Code 2014 > 33 Safeguards During Construction or Demolition > 3304 Soil and Foundation Work > 3304.3 Notification
3304.3 Safeguards During Construction or Demolition, Notification
, but no more than 48 hours prior to the commencement of such work. The notification shall state the date that such earthwork is to commence. Should ...
NYC Building Code 2008 > 33 Safeguards During Construction or Demolition > 3304 Excavation > 3304.3 Notification
Help Contact Us Privacy Terms
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code Compare
Code Compare
Highlight differences between any two building codes.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL PRICING