3314.4.1.5 Notification of Adjustable Suspended Scaffold Installation and Removal
JUMP TO FULL CODE CHAPTER
Prior
to the initial installation of the adjustable suspended scaffold at a site, and prior to the final
removal of the adjustable suspended scaffold at a site, the department shall be notified at least
24 hours, but not more than 48 hours, prior to such installation or removal. Should the
notification date fall on a weekend or official holiday, the notification shall be made on the
last business day before the commencement date of the installation or removal. Such
notification:
- Where the installation or removal occurs under the direct and continuing supervision of a licensed rigger or sign hanger, shall be made by such licensee; or
- Where the installation or removal does not occur under the direct and continuing supervision of a licensed rigger or sign hanger, shall be made by the designer of the scaffold.
Related Code Sections
3314.4.1.5 Safeguards During Construction or Demolition, Notification of Adjustable Suspended Scaffold Installation and Removal
Prior
to the initial installation of the adjustable suspended scaffold at a site, and prior to the final
removal of the adjustable suspended scaffold ...
NYC Building Code 2022 > 33 Safeguards During Construction or Demolition > 3314 Scaffolds > 3314.4 Installation, Inspection, Repair, Maintenance, Adjustment, Use, and Removal of Scaffolds > 3314.4.1 Installation and Removal > 3314.4.1.5 Notification of Adjustable Suspended Scaffold Installation and Removal
3314.4.1.5 Safeguards During Construction or Demolition, Notification of Adjustable Suspended Scaffold Installation and Removal
Prior to the initial installation of the adjustable suspended scaffold at a site, and prior to the final removal of the adjustable suspended scaffold ...
NYC Building Code 2014 > 33 Safeguards During Construction or Demolition > 3314 Scaffolds > 3314.4 Installation, Inspection, Repair, Maintenance, Adjustment, Use, and Removal of Scaffolds > 3314.4.1 Installation and Removal > 3314.4.1.5 Notification of Adjustable Suspended Scaffold Installation and Removal
3314.10 Safeguards During Construction or Demolition, Suspended Scaffold
and in a plane parallel to the wall at all times. The installation or change of position of any suspended scaffold shall be performed under ...
NYC Building Code 2008 > 33 Safeguards During Construction or Demolition > 3314 Scaffolds > 3314.10 Suspended Scaffold
3314.4 Safeguards During Construction or Demolition, Installation, Inspection, Repair, Maintenance, Adjustment, Use, and Removal of Scaffolds
involved in the installation or removal of a supported scaffold or an adjustable suspended scaffold, including the person supervising such work, shall ...
NYC Building Code 2022 > 33 Safeguards During Construction or Demolition > 3314 Scaffolds > 3314.4 Installation, Inspection, Repair, Maintenance, Adjustment, Use, and Removal of Scaffolds
3314.10 Safeguards During Construction or Demolition, Suspended Scaffold
Suspended scaffolds shall be installed and used in such a manner that the ropes or similar suspension elements ...
NYC Building Code 2014 > 33 Safeguards During Construction or Demolition > 3314 Scaffolds > 3314.10 Suspended Scaffold