• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects
    Architects
    General Contractors
    General Contractors
    Building Official & Plans Examiners
    Building Official & Plans Examiners
    Inspectors
    Inspectors
    Owners
    Owners
    Subcontractors
    Subcontractors
    Code Consultants
    Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

A-402.8.1 Notice of Start

Philadelphia Administrative Code > 4 Inspections > A-402 Permit Inspections > A-402.8 Inspection Requests > A-402.8.1 Notice of Start
JUMP TO FULL CODE CHAPTER
The code official or inspection agency having jurisdiction shall be contacted by the permit holder or his designee at least 24 hours prior to the start of work under a permit. The code official or the inspector having jurisdiction may perform an initial inspection of the site to ensure all site safety protections are in place.

Related Code Sections


A-402.8.1 Inspections, Notice of Start
to the start of work under a permit. The code official or the inspector having jurisdiction may perform an initial inspection of the site to ensure all site ...
Philadelphia Administrative Code > 4 Inspections > A-402 Permit Inspections > A-402.8 Inspection Requests > A-402.8.1 Notice of Start
A-305.2.2.3 Permits, Demolition Schedule
with code requirements for public notice. Identification of demolition milestones and projected dates of completion. The proposed start and stop ...
Philadelphia Administrative Code > 3 Permits > A-305 Construction Documents > A-305.2 Contents > A-305.2.2 Demolition Permits > A-305.2.2.3 Demolition Schedule
(A) Special Equipment, Starting
starting conditions. Exception: This limitation shall not apply for emergency run mechanical starting. [ 20: 9.4.2] ...
National Electrical Code 2014 of Philadelphia > 6 Special Equipment > 695 Fire Pumps > 695.7 Voltage Drop > (A) Starting
(A) Special Equipment, Starting
starting conditions. Exception: This limitation shall not apply for emergency run mechanical starting. [ 20: 9.4.2] ...
National Electrical Code 2017 of Philadelphia > 6 Special Equipment > 695 Fire Pumps > 695.7 Voltage Drop > (A) Starting
110.2 Scope and Administration, Notice
a written notice describing the imminent danger and specifying the required repair to render the structure safe, or requiring the imminently dangerous ...
Philadelphia Property Maintenance Code > 1 Scope and Administration > 110 Imminently Dangerous Structures > 110.2 Notice
Help Contact Us Privacy Terms
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code Compare
Code Compare
Highlight differences between any two building codes.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL PRICING