• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects
    Architects
    General Contractors
    General Contractors
    Building Official & Plans Examiners
    Building Official & Plans Examiners
    Inspectors
    Inspectors
    Owners
    Owners
    Subcontractors
    Subcontractors
    Code Consultants
    Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

1926.962(b)(2) No Possibility of Contact

OSHA 1926 Construction > V Electric Power Transmission and Distribution > 1926.962 Grounding for the Protection of Employees > 1926.962(b) General > 1926.962(b)(2) No Possibility of Contact
JUMP TO FULL CODE CHAPTER
There is no possibility of contact with another energized source.

Related Code Sections


1926.962(b)(2) Electric Power Transmission and Distribution, No Possibility of Contact
There is no possibility of contact with another energized source ...
OSHA 1926 Construction > V Electric Power Transmission and Distribution > 1926.962 Grounding for the Protection of Employees > 1926.962(b) General > 1926.962(b)(2) No Possibility of Contact
1926.964(b)(1) Electric Power Transmission and Distribution, Tension Stringing Method
, or other equivalent measures to minimize the possibility that conductors and cables the employees are installing or removing will contact energized power ...
OSHA 1926 Construction > V Electric Power Transmission and Distribution > 1926.964 Overhead Lines and Live-Line Barehand Work > 1926.964(b) Installing and Removing Overhead Lines > 1926.964(b)(1) Tension Stringing Method
1926.66(f)(7) Occupational Health and Environmental Controls, Maintenance of Grounds
to insure this contact and areas of contact shall be sharp points or knife edges where possible. Points of support of the object shall be concealed ...
OSHA 1926 Construction > D Occupational Health and Environmental Controls > 1926.66 Criteria for Design and Construction of Spray Booths > 1926.66(f) Electrostatic Hand Spraying Equipment > 1926.66(f)(7) Maintenance of Grounds
1926.1433(d)(9) Cranes & Derricks in Construction,
All exhaust pipes, turbochargers, and charge air coolers must be insulated or guarded where contact by employees (except for maintenance and repair ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1433 Design, Construction and Testing > 1926.1433(d) > 1926.1433(d)(9)
1926.408(c)(3)(i)(A) Electrical,
as to avoid the possibility of accidental contact with electric light or power conductors ...
OSHA 1926 Construction > K Electrical > 1926.408 Special Systems > 1926.408(c) Communications Systems > 1926.408(c)(3) Conductor Location > 1926.408(c)(3)(i) Outside of Buildings > 1926.408(c)(3)(i)(A)
Help Contact Us Privacy Terms
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code Compare
Code Compare
Highlight differences between any two building codes.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL PRICING