// CODE SNIPPET
§28-117.1.2 New Certificate Required
JUMP TO FULL CODE CHAPTER
The following changes to a place of assembly shall require a new place of assembly certificate of operation instead of an amendment filed in accordance with section 28-117.1.3:
- For a department issued place of assembly permit or place of assembly certificate of operation that does not have a nine-digit job number, any change of zoning use group, assembly occupancy group A-1 through A-5, or any of the changes set forth in section 28-117.1.3.
- For all other department issued place of assembly permits or place of assembly certificates of operation, any change of zoning use group or assembly occupancy group A-1 through A-5.
Related Code Sections
*§28-117.1.2 Administration, New Certificate Required
The following changes to a place of assembly shall require a new place of assembly certificate of operation instead of an amendment filed ...
NYC General Admin. Provisions 2008 > 1 Administration > 117 Places of Assembly > §28-117.1 Place of Assembly Certificate of Operation > *§28-117.1.2 New Certificate Required
§28-117.1.2 Administration, New Certificate Required
The following changes to a place of assembly shall require a new place of assembly certificate of operation instead of an amendment filed ...
NYC General Admin. Provisions 2014 > 1 Administration > 117 Places of Assembly > §28-117.1 Place of Assembly Certificate of Operation > §28-117.1.2 New Certificate Required
§28-117.1.2 Administration, New Certificate Required
The following changes to a place of assembly shall require a new place of assembly certificate of operation instead of an amendment filed ...
NYC General Admin. Provisions 2022 > 1 Administration > 117 Places of Assembly > §28-117.1 Place of Assembly Certificate of Operation > §28-117.1.2 New Certificate Required
3319.5 Safeguards During Construction or Demolition, Certificate of Operation
extensions to the boom beyond the maximum approval length or when the load ratings are increased, a new Certificate of Operation shall be required. In ...
NYC Building Code 2014 > 33 Safeguards During Construction or Demolition > 3319 Cranes and Derricks > 3319.5 Certificate of Operation
3319.5 Safeguards During Construction or Demolition, Certificate of Operation
extensions to the boom beyond the maximum approval length or when the load ratings are increased, a new certificate of operation shall be required. In ...
NYC Building Code 2008 > 33 Safeguards During Construction or Demolition > 3319 Cranes and Derricks > 3319.5 Certificate of Operation