// CODE SNIPPET
R609.5.2 Multistory Shearwalls
JUMP TO FULL CODE CHAPTER
Shearwall segments in an upper story shall be located directly over and within the length of shearwall segments in the story below. Reinforcement at the ends of shearwall segments shall be continuous from the bond beam of the upper story through the story below.
Exception: Offsetting of vertical reinforcement as set forth in Section R606.13.9.1 shall be permitted.
Related Code Sections
R609.5.2 Wall Construction, Multistory Shearwalls
Shearwall segments in an upper story shall be located directly over and within the length of shearwall segments in the story below. Reinforcement ...
2014 FBC - Residential, 5th edition > 6 Wall Construction > R609 Grouted Masonry > R609.5 Exterior Shearwalls > R609.5.2 Multistory Shearwalls
801.19 Chimneys and Vents, Multistory Prohibited
Common venting systems for appliances located on more than one floor level shall be prohibited, except where all of the appliances served ...
2014 FBC - Mechanical, 5th edition > 8 Chimneys and Vents > 801 General > 801.19 Multistory Prohibited
801.19 Chimneys and Vents, Multistory Prohibited
Common venting systems for appliances located on more than one floor level shall be prohibited, except where all of the appliances served ...
2017 FBC - Mechanical, 6th edition > 8 Chimneys and Vents > 801 General > 801.19 Multistory Prohibited
801.19 Chimneys and Vents, Multistory Prohibited
Common venting systems for appliances located on more than one floor level shall be prohibited, except where all of the appliances served ...
2020 FBC - Mechanical, 7th edition > 8 Chimneys and Vents > 801 General > 801.19 Multistory Prohibited
9.2.5.4 Hanging, Bracing, and Restraint of System Piping, Multistory Buildings
In multistory buildings, riser supports shall be provided at the lowest level, at each alternate level above, above and below offsets, and at the top ...
Standard for the Installation of Sprinkler Systems 2016 of Florida > 9 Hanging, Bracing, and Restraint of System Piping > 9.2* Installation of Pipe Hangers > 9.2.5 Support of Risers > 9.2.5.4 Multistory Buildings