• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects
    Architects
    General Contractors
    General Contractors
    Building Official & Plans Examiners
    Building Official & Plans Examiners
    Inspectors
    Inspectors
    Owners
    Owners
    Subcontractors
    Subcontractors
    Code Consultants
    Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

1926.1412(e) Monthly

OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1412 Inspections > 1926.1412(e) Monthly
JUMP TO FULL CODE CHAPTER

1926.1412(e)(1)

Each month the equipment is in service it must be inspected in accordance with paragraph (d) of this section (each shift).

1926.1412(e)(2)

Equipment must not be used until an inspection under this paragraph demonstrates that no corrective action under paragraphs (d)(2) and (3) of this section is required.

1926.1412(e)(3) Documentation

1926.1412(e)(3)(i)

The following information must be documented and maintained by the employer that conducts the inspection:

1926.1412(e)(3)(i)(A)

The items checked and the results of the inspection.

1926.1412(e)(3)(i)(B)

The name and signature of the person who conducted the inspection and the date.

1926.1412(e)(3)(ii)

This document must be retained for a minimum of three months.

Related Code Sections


1926.1412(e) Cranes & Derricks in Construction, Monthly
Each month the equipment is in service it must be inspected in accordance with paragraph (d) of this section (each shift ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1412 Inspections > 1926.1412(e) Monthly
1926.1435(f)(4) Cranes & Derricks in Construction, Monthly
The following additional items must be included ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1435 Tower Cranes > 1926.1435(f) Inspections > 1926.1435(f)(4) Monthly
1926.1437(h)(2) Cranes & Derricks in Construction, Monthly
For each monthly inspection: The means used ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1437 Floating Cranes/Derricks and Land Cranes/Derricks on Barges > 1926.1437(h) Inspections > 1926.1437(h)(2) Monthly
1926.1413(b) Cranes & Derricks in Construction, Monthly Inspection
The inspection must be documented according to ยง 1926.1412(e)(3) (monthly inspection documentation) ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1413 Wire Rope--Inspection > 1926.1413(b) Monthly Inspection
1926.1412(e)(3)(i)(B) Cranes & Derricks in Construction,
The name and signature of the person who conducted the inspection and the date ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1412 Inspections > 1926.1412(e) Monthly > 1926.1412(e)(3) Documentation > 1926.1412(e)(3)(i) > 1926.1412(e)(3)(i)(B)
Help Contact Us Privacy Terms
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code Compare
Code Compare
Highlight differences between any two building codes.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL PRICING