// CODE SNIPPET
37-43 Modification of Requirements for a Relocated or Renovated Subway Stair
JUMP TO FULL CODE CHAPTER
The Chairperson of the City Planning Commission may, by certification to the Commissioner of Buildings, allow modifications of the requirements of Sections 32-435 (Ground floor use in high density Commercial Districts) and 37-41 (Standards for Location, Design and Hours of Public Accessibility) or 37-70 (PUBLIC PLAZAS) if the relocated subway stair cannot be accommodated without modification to these provisions.
Related Code Sections
Section G501 Flood-Resistant Construction, Modifications
of the department for any subsequent additions, modifications or deletions that may have been made to this standard in accordance with Section 28-103.19 ...
Section G501 Flood-Resistant Construction, Modifications
intervention. Dry floodproofing measures that require human intervention to activate or implement prior to or during a flood, including temporary stairs ...
1210.2.4 Hydronic Piping, Relocation
The commissioner, where deemed necessary, shall require the replacement or relocation of any joints, guides or anchors. The commissioner shall cause ...
NYC Mechanical Code 2008 > 12 Hydronic Piping > 1210 High-Pressure Steam Piping Systems > 1210.2 New Systems > 1210.2.4 Relocation
1210.2.4 Hydronic Piping, Relocation
The commissioner, where deemed necessary, shall require the replacement or relocation of any expansion joints, guides or anchors. The commissioner ...
NYC Mechanical Code 2014 > 12 Hydronic Piping > 1210 High-Pressure Steam and High Temperature Hot Water Piping Systems > 1210.2 New Systems > 1210.2.4 Relocation
1211.2.4 Hydronic Piping, Relocation
The commissioner, where deemed necessary, shall require the replacement or relocation of any expansion joints, guides or anchors. The commissioner ...
NYC Mechanical Code 2022 > 12 Hydronic Piping > 1211 High-Pressure Steam and High Temperature Hot Water Piping Systems > 1211.2 New Systems > 1211.2.4 Relocation