• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects
    Architects
    General Contractors
    General Contractors
    Building Official & Plans Examiners
    Building Official & Plans Examiners
    Inspectors
    Inspectors
    Owners
    Owners
    Subcontractors
    Subcontractors
    Code Consultants
    Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

1910.95(g)(5)(ii) Mobile Test Van Exception

OSHA 1910 General Industry > G Occupational Health and Environmental Control > 1910.95 Occupational Noise Exposure > 1910.95(g) Audiometric Testing Program > 1910.95(g)(5) Baseline Audiogram > 1910.95(g)(5)(ii) Mobile Test Van Exception
JUMP TO FULL CODE CHAPTER
Where mobile test vans are used to meet the audiometric testing obligation, the employer shall obtain a valid baseline audiogram within 1 year of an employee's first exposure at or above the action level. Where baseline audiograms are obtained more than 6 months after the employee's first exposure at or above the action level, employees shall wear hearing protectors for any period exceeding six months after first exposure until the baseline audiogram is obtained.

Related Code Sections


1910.95(g)(5)(ii) Occupational Health and Environmental Control, Mobile Test Van Exception
Where mobile test vans are used to meet the audiometric testing obligation, the employer shall obtain a valid baseline audiogram within 1 year ...
OSHA 1910 General Industry > G Occupational Health and Environmental Control > 1910.95 Occupational Noise Exposure > 1910.95(g) Audiometric Testing Program > 1910.95(g)(5) Baseline Audiogram > 1910.95(g)(5)(ii) Mobile Test Van Exception
1910.302(a)(1)(iv) Electrical, Mobile Homes
OSHA 1910 General Industry > S Electrical > 1910.302 Electric Utilization Systems > 1910.302(a) Scope > 1910.302(a)(1) Covered > 1910.302(a)(1)(iv) Mobile Homes
1910.67(a)(6) Powered Platforms, Manlifts, and Vehicle-Mounted Work Platforms, Mobile Unit
A combination of an aerial device, its vehicle, and related equipment ...
OSHA 1910 General Industry > F Powered Platforms, Manlifts, and Vehicle-Mounted Work Platforms > 1910.67 Vehicle-Mounted Elevating and Rotating Work Platforms > 1910.67(a) Definitions Applicable to This Section > 1910.67(a)(6) Mobile Unit
1910.109(g)(5)(i)(c) Hazardous Materials,
Semitrailer or full-trailer vans used for highway or onsite transportation of the blasting agents are satisfactory for temporarily storing ...
OSHA 1910 General Industry > H Hazardous Materials > 1910.109 Explosives and Blasting Agents > 1910.109(g) Blasting Agents > 1910.109(g)(5) Storage of Blasting Agents and Supplies > 1910.109(g)(5)(i) > 1910.109(g)(5)(i)(c)
1910.305(g)(1)(ii)(D) Electrical, Portable and Mobile Signs
OSHA 1910 General Industry > S Electrical > 1910.305 Wiring Methods, Components, and Equipment for General Use > 1910.305(g) Flexible Cords and Cables > 1910.305(g)(1) Use of Flexible Cords and Cables > 1910.305(g)(1)(ii) Flexible Cords and Cables May Be Used Only For: > 1910.305(g)(1)(ii)(D) Portable and Mobile Signs
Help Contact Us Privacy Terms
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code Compare
Code Compare
Highlight differences between any two building codes.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL PRICING