C403.2.7.3.1 Mechanical Fastening
JUMP TO FULL CODE CHAPTER
All joints between sections of air ducts and plenums, between intermediate and terminal fittings and other components of air distribution systems, and between subsections of these components shall be mechanically fastened to secure the sections independently of the closure system(s).
All joints between sections of air ducts and plenums, between intermediate and terminal fittings and other components of air distribution systems, and between subsections of these components shall be mechanically fastened to secure the sections independently of the closure system(s).
Related Code Sections
1405.12.6 Exterior Walls, Mechanical Fastenings
sidewalk level shall, in addition to the mastic cement and shelf angles, be held in place by the use of fastenings at each vertical or horizontal edge ...
2017 FBC - Building, 6th edition > 14 Exterior Walls > 1405 Installation of Wall Coverings > 1405.12 Glass Veneer > 1405.12.6 Mechanical Fastenings
1405.12.6 Exterior Walls, Mechanical Fastenings
sidewalk level shall, in addition to the mastic cement and shelf angles, be held in place by the use of fastenings at each vertical or horizontal edge ...
2014 FBC - Building, 5th edition > 14 Exterior Walls > 1405 Installation of Wall Coverings > 1405.12 Glass Veneer > 1405.12.6 Mechanical Fastenings
1405.12.6 Exterior Walls, Mechanical Fastenings
sidewalk level shall, in addition to the mastic cement and shelf angles, be held in place by the use of fastenings at each vertical or horizontal edge ...
2020 FBC - Building, 7th edition > 14 Exterior Walls > 1405 Installation of Wall Coverings > 1405.12 Glass Veneer > 1405.12.6 Mechanical Fastenings
C403.2.7.3.1 [CE] Commercial Energy Efficiency, Mechanical Fastening
, and between subsections of these components shall be mechanically fastened to secure the sections independently of the closure system(s) ...
2014 FBC - Energy Conservation, 5th edition > 4 [CE] Commercial Energy Efficiency > C403 Building Mechanical Systems > C403.2 Provisions Applicable to All Mechanical Systems (Mandatory) > C403.2.7 Duct and Plenum Insulation, Construction and Sealing (Mandatory) > C403.2.7.3 Sealing, General (Mandatory) > C403.2.7.3.1 Mechanical Fastening
C403.2.9.3.1 [CE] Commercial Energy Efficiency, Mechanical Fastening
, and between sub sections of these components shall be mechanically fastened to secure the sections independently of the closure system(s) ...
2017 FBC - Energy Conservation, 6th edition > 4 [CE] Commercial Energy Efficiency > C403 Building Mechanical Systems > C403.2 Provisions Applicable to All Mechanical Systems (Mandatory) > C403.2.9 Duct and Plenum Insulation, Construction and Sealing (Mandatory) > C403.2.9.3 Sealing, General (Mandatory) > C403.2.9.3.1 Mechanical Fastening