• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

P-507.4 Material and Design

Philadelphia Plumbing Code > 5 Traps, Cleanouts, Interceptors, and Backwater Valves > P-507 Cleanouts > P-507.4 Material and Design
JUMP TO FULL CODE CHAPTER
The bodies of cleanout ferrules shall conform in thickness to that required for pipe and fittings of the same metal or of nylon resin, shall extend not less than 1/8 inch and shall be provided with a raised nut or recessed socket for removal.

P-507.4.1 Threads

Both ferrule and plug shall have American National Tapered Pipe Threads and are permitted for repairing a cleanout, where necessary.

Related Code Sections


P-507.4 Traps, Cleanouts, Interceptors, and Backwater Valves, Material and Design
The bodies of cleanout ferrules shall conform in thickness to that required for pipe and fittings of the same metal or of nylon resin, shall extend ...
Philadelphia Plumbing Code > 5 Traps, Cleanouts, Interceptors, and Backwater Valves > P-507 Cleanouts > P-507.4 Material and Design
Section C102 [CE] Scope and Administration, Alternative Materials, Design and Methods of Construction and Equipment
The provisions of this code are not intended to prevent the installation of any material or to prohibit any design or method of construction ...
2018 Philadelphia Energy Conservation Code > 1 [CE] Scope and Administration > C102 Alternative Materials, Design and Methods of Construction and Equipment
Help Contact Us Privacy Terms
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code Compare
Code Compare
Highlight differences between any two building codes.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE