• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

§28-207.2.4 Mandatory Stop Work Orders

NYC General Admin. Provisions 2014 > 2 Enforcement > 207 Peremptory Orders > *§28-207.2 Stop Work Orders > §28-207.2.4 Mandatory Stop Work Orders
JUMP TO FULL CODE CHAPTER
The commissioner shall issue stop work orders in the circumstances set forth below. Upon issuance of such stop work order, the work shall immediately stop and shall not resume until the stop work order is rescinded by the department. The stop work order shall not be rescinded less than two business days after the date of issuance of such order. Nothing in the following sections shall be construed to limit the commissioner's power to issue stop work orders in other circumstances.

§28-207.2.4.1 Scaffold Safety

A stop work order shall be issued if a permit holder or person directly in charge of any suspended scaffold supported by c-hooks or outrigger beams fails to notify the department prior to the installation or use of such equipment as required by section 3314.1.1 of the New York city Building code and either:
  1. The rigger does not hold a license required by this code, or
  2. The workers lack certificates of fitness as required by this code or applicable rule, or
  3. The rigger failed to file with the department satisfactory evidence of insurance required by this code.

Related Code Sections


§28-207.2.4 Enforcement, Mandatory Stop Work Orders
The commissioner shall issue stop work orders in the circumstances set forth below. Upon issuance of such stop work order, the work shall immediately ...
NYC General Admin. Provisions 2014 > 2 Enforcement > 207 Peremptory Orders > *§28-207.2 Stop Work Orders > §28-207.2.4 Mandatory Stop Work Orders
§28-207.2.4 Enforcement, Mandatory Stop Work Orders
The commissioner shall issue stop work orders in the circumstances set forth below. Upon issuance of such stop work order, the work shall immediately ...
NYC General Admin. Provisions 2008 > 2 Enforcement > 207 Peremptory Orders > §28-207.2 Stop Work Orders > §28-207.2.4 Mandatory Stop Work Orders
Section 114 Administration, Stop Work Order
Refer to Chapter 2 of Title 28 of the Administrative Code ...
NYC Building Code 2008 > 1 Administration > 114 Stop Work Order
Section 115 Administration, Stop Work Order
Refer to Chapter 2 of Title 28 of the Administrative Code ...
NYC Building Code 2014 > 1 Administration > 115 Stop Work Order
§28-401.19.4 Licensing and Registration of Businesses, Trades and Occupations Engaged in Building Work, Mandatory Suspension or Revocation
of violations of any provisions of this code relating to a stop work order, public health or safety, structural integrity, building in compliance ...
NYC General Admin. Provisions 2008 > 4 Licensing and Registration of Businesses, Trades and Occupations Engaged in Building Work > 401 General > §28-401.19 Suspension or Revocation of License or Certificate of Competence > §28-401.19.4 Mandatory Suspension or Revocation
Help Contact Us Privacy Terms
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
Code Compare
Code Compare
Highlight differences between any two building codes.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE