• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

1910.265(f)(3)(i) Main Kiln Doors

OSHA 1910 General Industry > R Special Industries > 1910.265 Sawmills > 1910.265(f) Dry Kilns and Facilities > 1910.265(f)(3) Doors > 1910.265(f)(3)(i) Main Kiln Doors
JUMP TO FULL CODE CHAPTER

1910.265(f)(3)(i)(a)

Main kiln doors shall be provided with a method of holding them open while kiln is being loaded.

1910.265(f)(3)(i)(b)

Counterweights on vertical lift doors shall be boxed or otherwise guarded.

1910.265(f)(3)(i)(c)

Adequate means shall be provided to firmly secure main doors, when they are disengaged from carriers and hangers, to prevent toppling.

Related Code Sections


1910.265(f)(3)(i) Special Industries, Main Kiln Doors
Main kiln doors shall be provided with a method of holding them open while kiln is being loaded ...
OSHA 1910 General Industry > R Special Industries > 1910.265 Sawmills > 1910.265(f) Dry Kilns and Facilities > 1910.265(f)(3) Doors > 1910.265(f)(3)(i) Main Kiln Doors
1910.265(f)(3)(ii) Special Industries, Escape Doors
If operating procedures require access to kilns, kilns shall be provided with escape doors that operate easily from the inside, swing ...
OSHA 1910 General Industry > R Special Industries > 1910.265 Sawmills > 1910.265(f) Dry Kilns and Facilities > 1910.265(f)(3) Doors > 1910.265(f)(3)(ii) Escape Doors
1910.265(f)(3)(ii)(a) Special Industries,
If operating procedures require access to kilns, kilns shall be provided with escape doors that operate easily from the inside, swing ...
OSHA 1910 General Industry > R Special Industries > 1910.265 Sawmills > 1910.265(f) Dry Kilns and Facilities > 1910.265(f)(3) Doors > 1910.265(f)(3)(ii) Escape Doors > 1910.265(f)(3)(ii)(a)
1910.265(f)(5) Special Industries, Steam Mains
All high-pressure steam mains located in or adjacent to an operating pit shall be covered with heat-insulating material ...
OSHA 1910 General Industry > R Special Industries > 1910.265 Sawmills > 1910.265(f) Dry Kilns and Facilities > 1910.265(f)(5) Steam Mains
1910.265(b)(21) Special Industries, Kiln Tender
The term kiln tender means the operator of a kiln ...
OSHA 1910 General Industry > R Special Industries > 1910.265 Sawmills > 1910.265(b) Definitions Applicable to This Section > 1910.265(b)(21) Kiln Tender
Help Contact Us Privacy Terms
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code Compare
Code Compare
Highlight differences between any two building codes.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE