UpCodes logo
Go To Full Code Chapter
Before starting operations all connections to the machine shall be checked to make certain they are properly made. The work lead shall be firmly attached to the work; magnetic work clamps shall be freed from adherent metal particles of spatter on contact surfaces. Coiled welding cable shall be spread out before use to avoid serious overheating and damage to insulation.
Upcodes Diagrams

Related Code Sections

1910.254(d)(2) Welding, Cutting, and Brazing, Machine Hook Up
Before starting operations all connections to the machine shall be checked to make certain they are properly made. The work lead shall be firmly ...
1910.265(c)(24)(ii) Special Industries, Hooks
No open hook shall be used in rigging to lift any load where there is hazard from relieving the tension on the hook from the load or hook catching ...
1910.266(h)(5) Special Industries, Yarding
Each machine shall be positioned during winching so the machine and winch are operated within their design limits ...