• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

1910.147(c)(2) Lockout/Tagout

OSHA 1910 General Industry > J General Environmental Controls > 1910.147 The Control of Hazardous Energy (Lockout/Tagout) > 1910.147(c) General > 1910.147(c)(2) Lockout/Tagout
JUMP TO FULL CODE CHAPTER

1910.147(c)(2)(i)

If an energy isolating device is not capable of being locked out, the employer's energy control program under paragraph (c)(1) of this section shall utilize a tagout system.

1910.147(c)(2)(iii)

After January 2, 1990, whenever replacement or major repair, renovation or modification of a machine or equipment is performed, and whenever new machines or equipment are installed, energy isolating devices for such machine or equipment shall be designed to accept a lockout device.

1910.147(c)(2)(ii)

If an energy isolating device is capable of being locked out, the employer's energy control program under paragraph (c)(1) of this section shall utilize lockout, unless the employer can demonstrate that the utilization of a tagout system will provide full employee protection as set forth in paragraph (c)(3) of this section.

Related Code Sections


1910.147(c)(2) General Environmental Controls, Lockout/Tagout
program under paragraph (c)(1) of this section shall utilize lockout, unless the employer can demonstrate that the utilization of a tagout system ...
OSHA 1910 General Industry > J General Environmental Controls > 1910.147 The Control of Hazardous Energy (Lockout/Tagout) > 1910.147(c) General > 1910.147(c)(2) Lockout/Tagout
1910.269(d)(6) Special Industries, Lockout/Tagout Application
The established procedures for the application of energy control (the lockout or tagout procedures) shall include the following elements and actions ...
OSHA 1910 General Industry > R Special Industries > 1910.269 Electric Power Generation, Transmission, and Distribution > 1910.269(d) Hazardous Energy Control (Lockout/Tagout) Procedures > 1910.269(d)(6) Lockout/Tagout Application
1910.147(c)(2)(ii) General Environmental Controls,
utilize lockout, unless the employer can demonstrate that the utilization of a tagout system will provide full employee protection as set forth ...
OSHA 1910 General Industry > J General Environmental Controls > 1910.147 The Control of Hazardous Energy (Lockout/Tagout) > 1910.147(c) General > 1910.147(c)(2) Lockout/Tagout > 1910.147(c)(2)(ii)
1910.147(c)(2)(iii) General Environmental Controls,
machines or equipment are installed, energy isolating devices for such machine or equipment shall be designed to accept a lockout device ...
OSHA 1910 General Industry > J General Environmental Controls > 1910.147 The Control of Hazardous Energy (Lockout/Tagout) > 1910.147(c) General > 1910.147(c)(2) Lockout/Tagout > 1910.147(c)(2)(iii)
1910.147(e)(3)(i) General Environmental Controls,
Verification by the employer that the authorized employee who applied the device is not at the facility ...
OSHA 1910 General Industry > J General Environmental Controls > 1910.147 The Control of Hazardous Energy (Lockout/Tagout) > 1910.147(e) Release From Lockout or Tagout > 1910.147(e)(3) Lockout or Tagout Devices Removal > 1910.147(e)(3)(i)
Help Contact Us Privacy Terms
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code Compare
Code Compare
Highlight differences between any two building codes.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE