• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

1926.403(j)(3)(ii) Lighting Outlets and Points of Control

OSHA 1926 Construction > K Electrical > 1926.403 General Requirements > 1926.403(j) Over 600 Volts, Nominal > 1926.403(j)(3) Workspace About Equipment > 1926.403(j)(3)(ii) Lighting Outlets and Points of Control
JUMP TO FULL CODE CHAPTER
The lighting outlets shall be so arranged that persons changing lamps or making repairs on the lighting system will not be endangered by live parts or other equipment. The points of control shall be so located that persons are not likely to come in contact with any live part or moving part of the equipment while turning on the lights.

Related Code Sections


1926.403(j)(3)(ii) Electrical, Lighting Outlets and Points of Control
The lighting outlets shall be so arranged that persons changing lamps or making repairs on the lighting system will not be endangered by live parts ...
OSHA 1926 Construction > K Electrical > 1926.403 General Requirements > 1926.403(j) Over 600 Volts, Nominal > 1926.403(j)(3) Workspace About Equipment > 1926.403(j)(3)(ii) Lighting Outlets and Points of Control
1926.152(b)(4)(vi) Fire Protection and Prevention,
system is used, it shall be controlled by a switch located outside of the door. The ventilating equipment and any lighting fixtures shall be operated ...
OSHA 1926 Construction > F Fire Protection and Prevention > 1926.152 Flammable Liquids > 1926.152(b) Indoor Storage of Flammable Liquids > 1926.152(b)(4) > 1926.152(b)(4)(vi)
1926.405(a) Electrical, Wiring Methods
The provisions of this paragraph do not apply to conductors which form an integral part of equipment such as motors, controllers, motor control ...
OSHA 1926 Construction > K Electrical > 1926.405 Wiring Methods, Components, and Equipment for General Use > 1926.405(a) Wiring Methods
1926.1430(e) Cranes & Derricks in Construction, Crush/Pinch Points
The employer must train each employee who works with the equipment to keep clear of holes, and crush/pinch points and the hazards addressed ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1430 Training > 1926.1430(e) Crush/Pinch Points
1926.56 Occupational Health and Environmental Controls, Illumination
Construction areas, ramps, runways, corridors, offices, shops, and storage areas shall be lighted to not less than the minimum illumination ...
OSHA 1926 Construction > D Occupational Health and Environmental Controls > 1926.56 Illumination
Help Contact Us Privacy Terms
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
Code Compare
Code Compare
Highlight differences between any two building codes.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE