• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

611.9.2.6 Lighting Documentation

Green Construction Code 2015 > 6 Energy Conservation, Efficiency and Co2e Emission Reduction > 611 Energy Systems Commissioning and Completion > 611.9 Lighting and Electrical Systems Commissioning > 611.9.2 Lighting Controls Commissioning > 611.9.2.6 Lighting Documentation
JUMP TO FULL CODE CHAPTER
The following documentation for lights, systems and control devices shall be provided to the building owner:
  1. Settings determined during commissioning activities outlined in Section 611.9.2.
  2. A narrative describing the intent and functionality of all controls including any capability for users to override a schedule or master command.
  3. Specification sheets for all lighting equipment and controls.
  4. Operation manuals for each lighting control device. Required maintenance and maintenance schedules shall be clearly identified. Documentation and instructions necessary for building maintenance personnel to maintain and recalibrate lighting systems and controls.
  5. An annual inspection schedule for lighting controls.
  6. Troubleshooting information for dimming systems and the remediation of switching issues such as false-ons and false-offs.

Related Code Sections


611.9.2.6 Energy Conservation, Efficiency and Co2e Emission Reduction, Lighting Documentation
The following documentation for lights, systems and control devices shall be provided to the building owner: Settings determined during ...
Green Construction Code 2015 > 6 Energy Conservation, Efficiency and Co2e Emission Reduction > 611 Energy Systems Commissioning and Completion > 611.9 Lighting and Electrical Systems Commissioning > 611.9.2 Lighting Controls Commissioning > 611.9.2.6 Lighting Documentation
611.3.1 ENERGY CONSERVATION, EFFICIENCY AND CO2e EMISSION REDUCTION, Preconstruction Documentation, Lighting
Construction and owner education documents shall include floor plans, diagrams and notations of sufficient clarity describing the types of, location ...
Green Construction Code 2012 > 6 ENERGY CONSERVATION, EFFICIENCY AND CO2e EMISSION REDUCTION > 611 Energy Systems Commissioning and Completion > 611.3 Lighting and Electrical Systems Commissioning and Completion Requirements > 611.3.1 Preconstruction Documentation, Lighting
C408.3.2 [CE] Commercial Energy Efficiency, Documentation Requirements
The construction documents shall specify that documents certifying that the installed lighting controls meet documented performance criteria ...
Energy Conservation Code 2015 > 4 [CE] Commercial Energy Efficiency > C408 System Commissioning > C408.3 Lighting System Functional Testing > C408.3.2 Documentation Requirements
C408.3.2.2 [CE] Commercial Energy Efficiency, Manuals
for each piece of lighting equipment and lighting controls. Operation and maintenance manuals for each piece of lighting equipment. Required routine ...
Energy Conservation Code 2018 > 4 [CE] Commercial Energy Efficiency > C408 Maintenance Information and System Commissioning > C408.3 Functional Testing of Lighting Controls > C408.3.2 Documentation Requirements > C408.3.2.2 Manuals
C408.3.1.2 [CE] Commercial Energy Efficiency, Time-Switch Controls
in the enclosed space in which the switch is located. Simulate unoccupied condition. Verify and document the following: 7.1. Nonexempt lighting turns off ...
Energy Conservation Code 2015 > 4 [CE] Commercial Energy Efficiency > C408 System Commissioning > C408.3 Lighting System Functional Testing > C408.3.1 Functional Testing > C408.3.1.2 Time-Switch Controls
Help Contact Us Privacy Terms
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code Compare
Code Compare
Highlight differences between any two building codes.
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE