• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

*§28-424.1 Lift Director Required

NYC General Admin. Provisions 2014 > 4 Licensing and Registration of Businesses, Trades and Occupations Engaged in Building Work > *424 Lift Director Registration > *§28-424.1 Lift Director Required
JUMP TO FULL CODE CHAPTER
It shall be unlawful for a crane or derrick that requires or possesses a certificate of on-site inspection, or which, in accordance with rules promulgated by the commissioner, is subject to supervision by a licensed master rigger in lieu of a certificate of on-site inspection, to perform any of the following tasks unless a lift director is present at the site during all times when:
  1. The crane or derrick is picking a load;
  2. The crane is traveling at the site, including but not limited to being moved onto or off of cribbing or up or down a ramp;
  3. The crane or derrick is being placed into a parked condition or otherwise being taken out of service;
  4. The crane's or derrick's boom/jib is being laid down or jackknifed;
  5. The crane's or derrick's boom/jib is being raised from a laid down or jackknifed position; or
  6. Other special protective measures for wind are being installed or removed.
Exception: The requirement for a lift director does not apply to the assembly or disassembly of a crane or derrick, nor to the use of an assist crane or derrick during assembly/disassembly, provided an assembly/disassembly director is supervising the assembly/disassembly operation in accordance with rules promulgated by the commissioner.

Related Code Sections


*§28-424.1 Licensing and Registration of Businesses, Trades and Occupations Engaged in Building Work, Lift Director Required
or removed. Exception : The requirement for a lift director does not apply to the assembly or disassembly of a crane or derrick, nor ...
NYC General Admin. Provisions 2014 > 4 Licensing and Registration of Businesses, Trades and Occupations Engaged in Building Work > *424 Lift Director Registration > *§28-424.1 Lift Director Required
*3319.2.3 Safeguards During Construction or Demolition, Lift Directors
Lift directors shall be designated, and perform the duties assigned to them, in accordance with rules promulgated by the commissioner ...
NYC Building Code 2014 > 33 Safeguards During Construction or Demolition > 3319 Cranes and Derricks > *3319.2 Personnel > *3319.2.3 Lift Directors
*§28-309.6 Maintenance of Buildings, Suspension
The director of the office of long-term planning and sustainability may suspend all or part of the requirement to benchmark pursuant to this article ...
NYC General Admin. Provisions 2008 > 3 Maintenance of Buildings > 309 *Benchmarking Energy and Water Use > *§28-309.6 Suspension
§28-309.6 Maintenance of Buildings, Suspension
The director of the office of long-term planning and sustainability may suspend all or part of the requirement to benchmark pursuant to this article ...
NYC General Admin. Provisions 2014 > 3 Maintenance of Buildings > 309 Benchmarking Energy and Water Use and Disclosure of Energy Efficiency Scores and Grades > §28-309.6 Suspension
§28-406.3.1 Licensing and Registration of Businesses, Trades and Occupations Engaged in Building Work, Director
Each laboratory shall have in responsible charge a director who shall be a registered design professional and who shall personally supervise all ...
NYC General Admin. Provisions 2008 > 4 Licensing and Registration of Businesses, Trades and Occupations Engaged in Building Work > 406 Concrete Testing Laboratory License > §28-406.3 Additional Requirements > §28-406.3.1 Director
Help Contact Us Privacy Terms
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code Compare
Code Compare
Highlight differences between any two building codes.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE