• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

11-42 Lapse of Authorization or Special Permit Granted by the City Planning Commission Pursuant to the 1961 Zoning Resolution

NYC Zoning Resolution > I General Provisions > 1 - Title, Establishment of Controls and Interpretation of Regulations > 11-40 Exceptions, Variances, Authorizations or Permits > 11-42 Lapse of Authorization or Special Permit Granted by the City Planning Commission Pursuant to the 1961 Zoning Resolution
JUMP TO FULL CODE CHAPTER

(a)        Except as otherwise provided in paragraphs (b), (c) or (d) of this Section, any authorization or special permit granted by the City Planning Commission under the provisions of the 1961 Zoning Resolution shall automatically lapse if substantial construction, in accordance with the plans for which such special permit or authorization was granted, has not been completed within four years from the effective date of such permit or authorization. Substantial construction shall mean, in the case of a new building or buildings, the substantial construction of at least one building.For the purposes of this paragraph (a), abutting buildings on a single zoning lot shall be considered to be one building.

(b)        Any authorization or special permit for a site that is part of an urban renewal area or other government-sponsored or government-assisted project shall automatically lapse within four years from the date of the applicant's possession of the site, or sites, or the effective date of an authorization or special permit, whichever is later; or

(c)        Upon a showing that a longer time period for substantial construction is required for a phased construction program of a multi-building complex, the Commission may, at the time of granting an authorization or special permit, extend the period set forth in paragraph (a) of this Section to a period not to exceed 10 years; or

(d)        In the event judicial proceedings have been instituted to review the decision to grant any authorization or special permit, the lapse period set forth in paragraph (a), (b) or (c) of this Section, whichever is applicable, shall commence upon the date of entry of the final order in such proceedings, including appeals.

Related Code Sections


§28-501.1 Miscellaneous Provisions, Permit Required
or maintain a sign, as defined in section 12-10 of the zoning resolution, on any building or premises unless a permit for the maintenance of such sign has ...
NYC General Admin. Provisions 2008 > 5 Miscellaneous Provisions > 501 Maintenance Permit for Outdoor Signs > §28-501.1 Permit Required
§28-501.1.2 Miscellaneous Provisions, Arterial Highway
and major streets as principal routes, parkways or toll crossings and that have been designated by the city planning commission as arterial highways to which ...
NYC General Admin. Provisions 2014 > 5 Miscellaneous Provisions > 501 Maintenance Permit for Outdoor Signs > §28-501.1 Permit Required > §28-501.1.2 Arterial Highway
§28-101.4.5.3 Administration, Effect on Zoning Resolution
to be retained pursuant to the New York city zoning resolution ...
NYC General Admin. Provisions 2014 > 1 Administration > 101 General > §28-101.4 Effective Date > §28-101.4.5 Work That Increases Existing Floor Surface Area of a Prior Code Building by More Than 110 Percent > §28-101.4.5.3 Effect on Zoning Resolution
§28-501.5 Miscellaneous Provisions, Construction
of such sign would otherwise be prohibited pursuant to the zoning resolution, the administrative code or any other provision of law. No permit for a sign ...
NYC General Admin. Provisions 2014 > 5 Miscellaneous Provisions > 501 Maintenance Permit for Outdoor Signs > §28-501.5 Construction
§28-104.2.5 Administration, Phased or Partial Approval
with the zoning resolution; The foundation plans, as provided for in section 106.7.1 of the New York city building code, as well as a loading diagram ...
NYC General Admin. Provisions 2014 > 1 Administration > 104 Construction Documents > *§28-104.2 Application for Approval of Construction Documents > §28-104.2.5 Phased or Partial Approval
Help Contact Us Privacy Terms
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code Compare
Code Compare
Highlight differences between any two building codes.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE