• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

2207A.6 Joist Chord Bracing

Los Angeles Building Code > 22A Steel > 2207A Steel Joists > 2207A.6 Joist Chord Bracing
JUMP TO FULL CODE CHAPTER

The chords of all joists shall be laterally supported at all points where the chords change direction.

Related Code Sections


2207A.6 Steel, Joist Chord Bracing
The chords of all joists shall be laterally supported at all points where the chords change direction ...
Los Angeles Building Code > 22A Steel > 2207A Steel Joists > 2207A.6 Joist Chord Bracing
2212.4.2 Steel, Joist Chord Bracing
The chords of all joists shall be laterally supported at all points where the chords change direction ...
Los Angeles Building Code > 22 Steel > 2212 Additional Requirements for Community Colleges [DSA-SS/CC] > 2212.4 Steel Joists > 2212.4.2 Joist Chord Bracing
906.5 Installation of Specific Appliances, Bracing
The space provided for the furnace shall be framed with doubled joists and with headers not lighter than the joists. [NFPA 54:10.11.5] ...
Los Angeles Mechanical Code > 9 Installation of Specific Appliances > 906.0 Floor Furnaces > 906.5 Bracing
906.5 Installation of Specific Appliances, Bracing
The space provided for the furnace shall be framed with doubled joists and with headers not lighter than the joists. [NFPA 54:10.11.5] ...
Los Angeles Mechanical Code > 9 Installation of Specific Appliances > 906.0 Floor Furnaces > 906.5 Bracing
A111.4.3 Guidelines for the Seismic Retrofit of Existing Buildings, Chords
An analysis for diaphragm flexure need not be made, and chords need not be provided ...
Los Angeles Existing Building Code > A Guidelines for the Seismic Retrofit of Existing Buildings > A111 Special Procedure > A111.4 Wood Diaphragms > A111.4.3 Chords
Help Contact Us Privacy Terms
Code Compare
Code Compare
Highlight differences between any two building codes.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE