• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

306.7.1 Joints at Coping

Swimming Pool and Spa Code 2015 > 3 General Compliance > 306 Decks > 306.7 Concrete Joints > 306.7.1 Joints at Coping
JUMP TO FULL CODE CHAPTER
Joints that occur where the pool coping meets the concrete deck shall be installed to protect the coping and its mortar bed from damage as a result of the anticipated movement of adjoining deck.

Related Code Sections


306.6.1 General Compliance, Joints at Coping
Joints that occur where the pool coping meets the concrete deck shall be installed to protect the coping and its mortar bed from damage as a result ...
Swimming Pool and Spa Code 2012 > 3 General Compliance > 306 Decks > 306.6 Concrete Joints > 306.6.1 Joints at Coping
306.7.1 General Compliance, Joints at Coping
Joints that occur where the pool coping meets the concrete deck shall be installed to protect the coping and its mortar bed from damage as a result ...
Swimming Pool and Spa Code 2018 > 3 General Compliance > 306 Decks > 306.7 Concrete Joints > 306.7.1 Joints at Coping
306.7.1 General Compliance, Joints at Coping
Joints that occur where the pool coping meets the concrete deck shall be installed to protect the coping and its mortar bed from damage as a result ...
Swimming Pool and Spa Code 2015 > 3 General Compliance > 306 Decks > 306.7 Concrete Joints > 306.7.1 Joints at Coping
1503.2 Roof Assemblies and Rooftop Structures, Flashing
Flashing shall be installed in such a manner so as to prevent moisture entering the wall and roof through joints in copings, through moisture ...
International Building Code 2012 > 15 Roof Assemblies and Rooftop Structures > 1503 Weather Protection > 1503.2 Flashing
1503.2 Roof Assemblies and Rooftop Structures, Flashing
Flashing shall be installed in such a manner so as to prevent moisture entering the wall and roof through joints in copings, through moisture ...
International Building Code 2009 > 15 Roof Assemblies and Rooftop Structures > 1503 Weather Protection > 1503.2 Flashing
Help Contact Us Privacy Terms
Code Compare
Code Compare
Highlight differences between any two building codes.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE