• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

1926.1415(a)(3) Jib Stops (If a Jib Is Attached), Except for Derricks

OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1415 Safety Devices > 1926.1415(a) Safety Devices > 1926.1415(a)(3) Jib Stops (If a Jib Is Attached), Except for Derricks
JUMP TO FULL CODE CHAPTER

Related Code Sections


1926.1415(a)(3) Cranes & Derricks in Construction, Jib Stops (If a Jib Is Attached), Except for Derricks
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1415 Safety Devices > 1926.1415(a) Safety Devices > 1926.1415(a)(3) Jib Stops (If a Jib Is Attached), Except for Derricks
1926.1435(d)(2)(ii) Cranes & Derricks in Construction,
Jib stops on luffing boom type tower cranes if equipped with a jib attachment ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1435 Tower Cranes > 1926.1435(d) Safety Devices > 1926.1435(d)(2) > 1926.1435(d)(2)(ii)
1926.1404(h)(5) Cranes & Derricks in Construction, Boom and Jib Pick Points
The point(s) of attachment of rigging to a boom (or boom sections or jib or jib sections) must be suitable for preventing structural damage ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1404 Assembly/Disassembly--General Requirements (Applies to All Assembly and Disassembly Operations) > 1926.1404(h) Addressing Specific Hazards > 1926.1404(h)(5) Boom and Jib Pick Points
1926.1416(d)(2) Cranes & Derricks in Construction, Luffing Jib Limiting Device
) of this section, except to limit the movement of the luffing jib rather than the boom hoist ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1416 Operational Aids > 1926.1416(d) Category I Operational Aids and Alternative Measures > 1926.1416(d)(2) Luffing Jib Limiting Device
1926.1431(d) Cranes & Derricks in Construction, Equipment Criteria
). Personnel hoisting operations must not begin unless the devices listed in this section are in proper working order. If a device stops working properly during ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1431 Hoisting Personnel > 1926.1431(d) Equipment Criteria
Help Contact Us Privacy Terms
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code Compare
Code Compare
Highlight differences between any two building codes.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE