[A] 111.2 Issuance
JUMP TO FULL CODE CHAPTER
A stop work order shall be in writing and shall be given to the owner of the property, or to the owner's authorized agent, or to the person doing the work. Upon issuance of a stop work order, the cited work shall immediately cease. The stop work order shall state the reason for the order, and the conditions under which the cited work is authorized to resume.
Related Code Sections
111.2 Scope and Administration, Issuance
the work. Upon issuance of a stop work order, the cited work shall immediately cease. The stop work order shall state the reason for the order ...
114.2 Scope and Administration, Issuance
the work. Upon issuance of a stop work order, the cited work shall immediately cease. The stop work order shall state the reason for the order ...
Los Angeles Existing Building Code > 1 Scope and Administration > 114 Stop Work Order > 114.2 Issuance
1204.1 Fuel Gas Piping, Issuance
Whereupon final piping inspection, the
installation is found to be in accordance with the provisions
of this code, a certificate of inspection shall ...
1304.1 Fuel Gas Piping, Issuance
Where upon final piping inspection, the
installation is found to be in accordance with the provisions
of this code, a certificate of inspection shall ...
Los Angeles Mechanical Code > 13 Fuel Gas Piping > 1304.0 Certificate of Inspection > 1304.1 Issuance
1304.1 Fuel Gas Piping, Issuance
Where upon final piping inspection, the
installation is found to be in accordance with the provisions
of this code, a certificate of inspection shall ...
Los Angeles Mechanical Code > 13 Fuel Gas Piping > 1304.0 Certificate of Inspection > 1304.1 Issuance