• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects
    Architects
    General Contractors
    General Contractors
    Building Official & Plans Examiners
    Building Official & Plans Examiners
    Inspectors
    Inspectors
    Owners
    Owners
    Subcontractors
    Subcontractors
    Code Consultants
    Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

AE304.3.2 Investigation Fees-Work Without a Permit

2015 Michigan Residential Code > E Manufactured Housing Used as Dwellings > AE304 Fees > AE304.3 Other Provisions > AE304.3.2 Investigation Fees-Work Without a Permit
JUMP TO FULL CODE CHAPTER

AE304.3.2.1 Investigation

Whenever any work for which a permit is required by these provisions has been commenced without first obtaining said permit, a special investigation shall be made before a permit may be issued for such work.

AE304.3.2.2 Fee

An investigation fee, in addition to the permit fee, shall be collected whether or not a permit is then or subsequently issued. The investigation fee shall be equal to the amount of the permit fee required. The minimum investigation fee shall be the same as the minimum fee established by the building official. The payment of such investigation fee shall not exempt any person from compliance with all other provision of either these prov1s10ns or other pertinent codes or from any penalty prescribed by law.

Related Code Sections


AE304.3.2 Manufactured Housing Used as Dwellings, Investigation Fees-Work Without a Permit
Whenever any work for which a permit is required by these provisions has been commenced without first obtaining said permit , a special ...
2015 Michigan Residential Code > E Manufactured Housing Used as Dwellings > AE304 Fees > AE304.3 Other Provisions > AE304.3.2 Investigation Fees-Work Without a Permit
Section C107 [CE] Scope and Administration, Fees
A permit shall not be issued until the fees prescribed in Section C107.2 have been paid, nor shall an amendment to a permit be released until ...
2015 Michigan Energy Code > 1 [CE] Scope and Administration > C107 Fees
Section R107 [RE] Scope and Administration, Fees
A permit shall not be issued until the fees prescribed in Section R107.2 have been paid, nor shall an amendment to a permit be released until ...
2015 Michigan Energy Code > 1 [RE] Scope and Administration > R107 Fees
106.6 Scope and Administration, Fees
] percent of the permit fee paid where work has been done under a permit issued in accordance with this code. Not more than [SPECIFY PERCENTAGE] percent ...
2018 Michigan Plumbing Code > 1 Scope and Administration > 106 Permits > 106.6 Fees
106.5 Scope and Administration, Fees
The fees prescribed by the act shall be paid to the enforcing agency of the jurisdiction before a permit to begin work for new construction ...
2015 Michigan Mechanical Code > 1 Scope and Administration > 106 Permits > 106.5 Fees
Help Contact Us Privacy Terms
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code Compare
Code Compare
Highlight differences between any two building codes.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL PRICING