3305.3.3.2.1 Intervals
Go To Full Code Chapter
Formwork shall be observed at intervals permitting observation of representative configurations throughout the project duration. The formwork designer shall maintain a log of such observations at the construction site. At a minimum, observations shall be made:
- Immediately after formwork related incidents or violations are issued; and
- When concrete construction operations are significantly modified such as changes to form materials, concrete placement cycle, or form and support layout prior to use of the change.
Upcodes Diagrams
Related Code Sections
1812.1.1.2.1 Soils and Foundations, Interval
Grout samples shall be collected and testing shall be performed for the lesser of the following conditions:
each element installed;
each batch ...
2109.4.1 Masonry, Intervals
Masonry walls shall be laterally supported in either the horizontal or vertical direction at intervals not exceeding those given in Table 2109.4.1 ...
3305.3.3.2.1 Safeguards During Construction or Demolition, Intervals
Formwork shall be observed at intervals permitting observation of representative configurations throughout the project duration. The formwork ...
3305.3.3.2.1 Safeguards During Construction or Demolition, Intervals
Formwork shall be observed at intervals permitting observation of representative configurations throughout the project duration. The formwork ...
2512.6 Gypsum Board, Gypsum Panel Products and Plaster, Curing and Interval
PLASTERS
COAT
MINIMUM PERIOD MOIST CURING
MINIMUM INTERVAL BETWEEN COATS
First
48 hoursa
48 hoursb
Second
48 hours
7 ...