P-1003.1 Interceptor Required
JUMP TO FULL CODE CHAPTER
Subsoil drains connected to street sewers or house drains shall discharge into and
through a properly trapped sand interceptor.
Related Code Sections
1009.3 Change of Occupancy, Interceptor Required
If the new occupancy will produce grease or oil-laden wastes, interceptors shall be provided as required in the International Plumbing Code ...
2018 Philadelphia Existing Building Code > 10 Change of Occupancy > 1009 Plumbing > 1009.3 Interceptor Required
P-1003.1 Storm Water Drainage Piping, Interceptor Required
Subsoil drains connected to street sewers or house drains shall discharge into and
through a properly trapped sand interceptor ...
Philadelphia Plumbing Code > 10 Storm Water Drainage Piping > P-1003 Subsoil Drains > P-1003.1 Interceptor Required
P-513.2 Traps, Cleanouts, Interceptors, and Backwater Valves, Requirements
where an interceptor is required by Section P-510.1 ...
Philadelphia Plumbing Code > 5 Traps, Cleanouts, Interceptors, and Backwater Valves > P-513 Garbage Grinders > P-513.2 Requirements
1002.1 Traps, Interceptors and Separators, Fixture Traps
compartment and the waste outlets are not more than 30 inches (762 mm) apart. A grease interceptor intended to serve as a fixture trap in accordance ...
Plumbing Code 2018 of Philadelphia > 10 Traps, Interceptors and Separators > 1002 Trap Requirements > 1002.1 Fixture Traps