R329.6.1 Installation Prior to Closing
Go To Full Code Chapter
Where the system is installed in a one- or two-family dwelling or townhouse unit that is owned by the builder and has yet to be sold, commissioning shall be conducted as outlined in Section R329.6, and the builder shall then transfer the required information in Section R329.6 to the homeowner when the property is transferred to the owner at the closing.
Related Code Sections
R329.6.1 Building Planning, Installation Prior to Closing
Where the system is installed in a one- or two-family dwelling or townhouse unit that is owned by the builder and has yet to be sold, commissioning ...
1318.6 Health Care Facilities and Medical Gas and Medical Vacuum Systems, Initial Pressure Test — Category 3 Copper Piping Systems
valves station outlets and inlets.
Prior to the installation of components of the distribution piping system that would be damaged by the test ...
R402.4.1.2 [RE] Residential Energy Efficiency, Testing
(see Table R402.4.1.1), operable windows and doors manufactured by small business shall be permitted to be sealed off at the frame prior to the test ...
406.1 Gas Piping Installations, General
Prior to acceptance and initial operation, all piping installations shall be visually inspected and pressure tested to determine that the materials ...
G2417.1 Fuel Gas, (406.1) General
Prior to acceptance and initial operation, all piping installations shall be visually inspected and pressure tested to determine that the materials ...