3314.4.3.3 Installation Inspection for Supported Scaffolds
JUMP TO FULL CODE CHAPTER
Upon completion of the
installation of a supported scaffold, the scaffold, all components of and attachments to the
scaffold, and all supports and anchorages of the scaffold, shall be inspected prior to use to
verify that they are in a safe condition and, where design is required, installed in accordance
with the design drawings. Such inspection shall be performed by a qualified person who has
completed the training required by Section 3314.4.5.1 and who is designated by the designer,
the installer, or a third party acceptable to both the designer and the installer. The results of
the inspection shall be documented in an installation inspection report signed and dated by the
person who performed the inspection. The scaffold shall not be used until it has passed such
inspection and the installation inspection report has been completed.
Exceptions:
- Where additional components or attachments are installed to an existing supported scaffold, or where existing deck planking or guardrails are relocated to a different level or location, the installation inspection and installation inspection report shall be limited to such components or attachments and related anchorages.
- An inspection and report is not required for a supported scaffold that, pursuant to Section 3314.3.1, is not required to be designed.
Related Code Sections
3314.4.3.3 Safeguards During Construction or Demolition, Installation Inspection for Supported Scaffolds
Upon completion of the
installation of a supported scaffold, the scaffold, all components of and attachments to the
scaffold, and all supports ...
NYC Building Code 2022 > 33 Safeguards During Construction or Demolition > 3314 Scaffolds > 3314.4 Installation, Inspection, Repair, Maintenance, Adjustment, Use, and Removal of Scaffolds > 3314.4.3 Inspections > 3314.4.3.3 Installation Inspection for Supported Scaffolds
3314.4.3.3 Safeguards During Construction or Demolition, Installation Inspection for Supported Scaffolds
Upon completion of the installation of a supported scaffold, the scaffold, all components of and attachments to the scaffold, and all supports ...
NYC Building Code 2014 > 33 Safeguards During Construction or Demolition > 3314 Scaffolds > 3314.4 Installation, Inspection, Repair, Maintenance, Adjustment, Use, and Removal of Scaffolds > 3314.4.3 Inspections > 3314.4.3.3 Installation Inspection for Supported Scaffolds
3314.10.2 Safeguards During Construction or Demolition, Support
of supporting at least 4 times the load imposed on them by the scaffold operating at the rated load of the hoist. The support shall be inspected ...
NYC Building Code 2008 > 33 Safeguards During Construction or Demolition > 3314 Scaffolds > 3314.10 Suspended Scaffold > 3314.10.2 Support
3314.4.6 Safeguards During Construction or Demolition, Adjustments
Scaffolds, all components of and attachments to the scaffold, and all supports and anchorages of the scaffold installed at a site shall be adjusted ...
NYC Building Code 2014 > 33 Safeguards During Construction or Demolition > 3314 Scaffolds > 3314.4 Installation, Inspection, Repair, Maintenance, Adjustment, Use, and Removal of Scaffolds > 3314.4.6 Adjustments
3314.4 Safeguards During Construction or Demolition, Installation, Inspection, Repair, Maintenance, Adjustment, Use, and Removal of Scaffolds
Scaffolds shall be installed, inspected, repaired, maintained, adjusted, used, and removed in accordance with the specifications of the manufacturer ...
NYC Building Code 2014 > 33 Safeguards During Construction or Demolition > 3314 Scaffolds > 3314.4 Installation, Inspection, Repair, Maintenance, Adjustment, Use, and Removal of Scaffolds